When to install the toilet with water during renovation

Updated on Toilets 2024-06-10
2 answers
  1. Anonymous users2024-01-24

    If it is seeping water, there is a leak in the water pipe, and the wall tiles should be cut and repaired.

    If it is just a resurgence, it is that the waterproof layer of the bathroom is not done, it should be that the water pipes and waterproof layer were not done well during the decoration at that time, and the decoration company or workers should be found.

  2. Anonymous users2024-01-23

    If it is seeping water, there is a leak in the water pipe, and the wall tiles should be cut and repaired.

Related questions
6 answers2024-06-10

The water and electricity can be replaced after the change, and the protection can be done during the decoration process. If the rear installation will affect the progress of the decoration, for example, how to measure the size of the bread pass, there is no anti-theft door how high the ground is, brick paving and ground leveling are affected, if it is an old house, the door in the kitchen is generally installed before the mason, and the side may have to be tiled on the side.

3 answers2024-06-10

Finally, you can put it before the wardrobe at home.

1 answers2024-06-10

According to the different location or function of the wardrobe, you can determine the time of door-to-door re-ruler and accurate measurement, if your wardrobe is leaning against the wall or do not plan to move the position in the future, such as the cloakroom, after the ground cement leveling can ask the manufacturer to measure; If your wardrobe is one side against the wall or to move the position in the future, such as bookcases, shoe cabinets, TV cabinets, etc., it is best to ask the manufacturer to measure after the floor or floor tiles are paved, however, please rest assured, the general complex selection and confirmation of the cabinet pattern of the steps have been completed, there will be no delay in time, the general manufacturer's custom cycle is about 10 days, and it can be used directly after installation, it will not delay everyone's check-in time.

1 answers2024-06-10

Measured in two parts. The first time is when the water circuit is transformed, the initial test is carried out to determine the cabinet type and cabinet distribution, so as to avoid blocking important points; The second time is that the wall base is treated, the premise is to determine the height of the finished surface of the ground, and measure it carefully to ensure that the seams are tightly fitted. This content is provided by Renovation CBD.

2 answers2024-06-10

If the drying rod of the balcony is an automatic drying rack during decoration, you can ask the manufacturer to send workers to install it before decoration or before tiling. >>>More