When will the clothes pole of the balcony be installed during the decoration, and who will install i

Updated on Balcony 2024-01-28
2 answers
  1. Anonymous users2024-01-23

    If the drying rod of the balcony is an automatic drying rack during decoration, you can ask the manufacturer to send workers to install it before decoration or before tiling.

    If it is a fixed rod, you can find a random worker to take a percussion drill before and after tiling to install.

    Be sure to install it in front of the suspended ceiling.

  2. Anonymous users2024-01-22

    The drying rack is installed at the end of the renovation.

    If you seal the cabinet on the balcony, you also need to cut the length of the hanger.

    Those who sell drying racks are responsible for free installation.

Related questions
7 answers2024-01-28

After the suspended ceiling.

The drying rack has been prepared for the customer with a beautiful look that will not be affected. >>>More

2 answers2024-01-28

After the wall painting is completed, the keel is installed, and the wall paint is all completed or only left once can be put on the board, of course, the ground must be poured first.

1 answers2024-01-28

According to the different location or function of the wardrobe, you can determine the time of door-to-door re-ruler and accurate measurement, if your wardrobe is leaning against the wall or do not plan to move the position in the future, such as the cloakroom, after the ground cement leveling can ask the manufacturer to measure; If your wardrobe is one side against the wall or to move the position in the future, such as bookcases, shoe cabinets, TV cabinets, etc., it is best to ask the manufacturer to measure after the floor or floor tiles are paved, however, please rest assured, the general complex selection and confirmation of the cabinet pattern of the steps have been completed, there will be no delay in time, the general manufacturer's custom cycle is about 10 days, and it can be used directly after installation, it will not delay everyone's check-in time.

1 answers2024-01-28

Measured in two parts. The first time is when the water circuit is transformed, the initial test is carried out to determine the cabinet type and cabinet distribution, so as to avoid blocking important points; The second time is that the wall base is treated, the premise is to determine the height of the finished surface of the ground, and measure it carefully to ensure that the seams are tightly fitted. This content is provided by Renovation CBD.

4 answers2024-01-28

When to install balcony windows for home decoration?

The right choice is to customize the doors and windows before the renovation begins, and it takes 15 days to process the doors and windows from customization to installation. The specific installation time should be discussed with the foreman of the decoration team, and the new balcony windows will be installed when the decoration water, electricity, pipelines, etc. are laid. >>>More