-
The first suitable material to make is a polymer cementitious waterproof coating. How many times to do is determined by the performance of the product, generally 2 or 3 times. If you can't paint too much, the number of brushing is excessive, and the coating is too thick, it is easy to shrink the waterproof layer and other reasons will crack, which will affect the waterproof performance.
-
The bathroom wall is generally waterproof 2 times.
Bathroom waterproofing is generally done twice, before the developer does it, and after the delivery, it is done again.
Bathroom waterproof coating should generally be made meters high and painted 2-3 times. >>>More
As the area with the heaviest moisture in the house, the waterproof work should be put in the first place during construction, so as to avoid water seepage in the bathroom during use due to improper construction. What is the waterproof construction process of the bathroom? If you want to know, read on! >>>More
The wall of the bathroom should be waterproof, sanitary bathroom under the ceiling, should be brushed waterproof materials, whether double bathroom or single bathroom should be brushed waterproof, the bathroom is the place with the most water, the water will be messy when bathing, generally there is a bathroom in the double bathroom, there is a bedroom on the other side of a wall, the bathroom should also focus on the waterproof wall, all the ceiling below should be full of waterproof materials, this is a once and for all practice.
1. The waterproofing of the bathroom generally needs to be brushed 2-3 times. >>>More