-
If you don't rework, this problem can't be solved, if it's not too impactful, I suggest you don't rework, it's all your money that is wasted, if it's bad, it's better to rework,
-
Didn't you look for a level when you did it? ยทยท Obviously, it has to be reworked.
-
If the project is not accepted, it is better to let them rework.
Then let someone fix it.
Otherwise, if the guests come to eat. >>>More
High-rise buildings with a building height of more than 100m and their podiums, except for swimming pools, ice rinks, toilets with a construction area of less than 100m, indoor rooms of residences without centralized air conditioning and Grade A fire doors, and parts that are not suitable for water extinguishing, shall be equipped with automatic sprinkler systems.
The bathroom has a small slope The location of the floor drain is the lowest The water flow is very slow It should be that the slope is too small This will not affect anything It's just a little troublesome There is water on the ground You have to drag it If you do a good job of waterproofing, there is no problem if you don't seep water down.
There is no good way, only re-enactment.
Installed in a relatively high place, because some things such as water heaters in the future need electricity, even if you are uneasy, it is a hassle to save the time to use, and you don't have to worry about hidden dangers such as short circuits and electric shocks when you install them in high places.