    1.When purchasing, raw materials or low-value consumables are included first, and the five-five amortization method or one-time amortization method is used for apportionment.

    Borrowing at the time of purchase: raw materials - packaging and low-value consumables.

    Credit: cash on hand bank deposits accounts payable.

    2.It is used for production and is included in manufacturing expenses, and finally collected into production costs, and included in inventory goods or operating costs.

    Borrow: Manufacturing expenses (for workshop or worker use).

    Credit: Raw Materials – Packaging and Low-Value Consumables (50% of amortized cost, remaining 50% amortized at end of life).

    Borrow: Inventory of goods Operating costs.

    Credit: Manufacturing expenses.

    3.Office repairs are included in administrative expenses.

    Borrow: Administrative expenses.

    Credit: Raw Materials – Packaging and Low-Value Consumables (50% of amortized cost, remaining 50% amortized at end of life).

    4.It is included in the sales expenses for the purpose of increasing sales by renovating the office space of the sales staff and creating an environment that attracts customers.

    Borrow: Selling expenses.

    Credit: Raw Materials – Packaging and Low-Value Consumables (50% of amortized cost, remaining 50% amortized at end of life).

Related questions
1 answers2024-04-25

Yes. Such as: 07J916-1 residential exhaust duct.

This atlas is suitable for the design and selection of vertical exhaust ducts for residential kitchens and bathrooms, as well as product matching and construction and installation, and can be used by architectural engineering designers, housing developers, construction units and manufacturers of exhaust ducts for residential kitchens and toilets. It mainly includes various types of exhaust ducts (exhaust hoods, exhaust pipes, various types of automatic exhaust devices and diversion settings) and related building structures for residential kitchens and bathrooms. On the basis of the original residential exhaust duct, this atlas collects the current domestic representative residential kitchen and bathroom exhaust ducts that meet the current national standards, and adds natural exhaust ducts and variable section exhaust ducts. >>>More

1 answers2024-04-25

Answer: The fact that the brick of the kitchen magnetic room fell and injured the person and the construction party should have something to do with it.

10 answers2024-04-25

You have to make it clear whether the toilets that have been handed over are public resources, whether they belong to the Environmental Sanitation Bureau, urban construction or which supporting facilities. Unless there is an obstacle problem in the design and construction, the construction party is responsible, the designer has hidden dangers, and the construction party is not in the construction plan, or it is also responsible for pointing out the correction. After acceptance, it can be exempted from liability if it is not quality and hidden dangers, and the key lies in the competent unit and the cleaner and the injured person.

1 answers2024-04-25

OK! It's a must!

It is their responsibility to conscientiously construct and protect the safety of all property of Party A. >>>More

2 answers2024-04-25

If you don't dig up and inspect it as a last resort, I think the starting point is the same. What brand of coil is on the installation contract, the coil is a whole pipe, there is no joint, you only need to use the German Ruihao, the leakage point may be in the water separator joint, or the wall-hung boiler joint.