How to make the bathroom waterproof without formaldehyde

Updated on Bathroom 2024-03-28
1 answers
  1. Anonymous users2024-01-23

    Dig the best permeable waterproofing can be done by yourself.

    If the cement surface is to be waterproofed, use the super permeable waterproof guard of the black gold steel to do waterproofing (if it is incomplete, use the dug beautiful butadia glue to fill the complete and then do the waterproofing).

    For the tile surface, first check whether the filling of the tile gap is complete (if it is incomplete, fill it with dug beautiful butadia glue, and then use the black gold steel stone tile type to do waterproofing).

Related questions
10 answers2024-03-28

If you're worried about water leakage, the most direct way is to test the water. If there is a water mark on the root of the pipe, it must be that he didn't wrap the pipe for you, or he didn't make it tight. If you want to paint yourself, you can buy some polyurethane, but you don't use much of that, and most of it is sold in barrels. >>>More

9 answers2024-03-28

Make your own waterproofing and brush polyurethane waterproof paint. >>>More

4 answers2024-03-28

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

2 answers2024-03-28

Step Method Do a good job in the maintenance of the car at the grassroots level Normally, the ground is a cement mortar surface, and there are some special circumstances, such as the pipeline is not buried, and the ground is uneven, so the base should be smooth, the surface should be smoothed and calendered, solid, and there should be no hollowing, sanding, cracking, etc., and the moisture content of the base should meet the construction requirements of waterproof materials, not more than 9%. The flooding slope of the screed should be 2%, and the slope of 5% (1 20) should be wiped out at the root of the pipe against the wall to avoid water accumulation here. Pipe roots and floor drains that protrude from the floor and walls. >>>More

4 answers2024-03-28

The bathroom is mostly made of JS, polyurethane, Jintang water does not leak, plugging king, South Korea Shuangxiong, Japan Daguan and other waterproof, and first difficult and then easy, first local and then large, that is, the wall root, pipe cage, pipe root, the root of the wall to do arc 20 diameter, the root of the pipe ascending 20 30mm and do caulking, and then full coating, two application direction vertical, dry area to 300mm high, wet area to do 1800 high. 24-hour water storage without leakage, and then do the waterproof protective layer, and then the surface layer is done, and the second water storage needs to be done for 24 hours without leakage, to be qualified.