How to do waterproofing in the bathroom

Updated on Bathroom 2024-01-27
4 answers
  1. Anonymous users2024-01-23

    The bathroom is mostly made of JS, polyurethane, Jintang water does not leak, plugging king, South Korea Shuangxiong, Japan Daguan and other waterproof, and first difficult and then easy, first local and then large, that is, the wall root, pipe cage, pipe root, the root of the wall to do arc 20 diameter, the root of the pipe ascending 20 30mm and do caulking, and then full coating, two application direction vertical, dry area to 300mm high, wet area to do 1800 high. 24-hour water storage without leakage, and then do the waterproof protective layer, and then the surface layer is done, and the second water storage needs to be done for 24 hours without leakage, to be qualified.

  2. Anonymous users2024-01-22

    Before doing waterproofing, it is necessary to thoroughly clean the small corners of the ground, clean it with a brush, and the wall should not have a layer that is easy to fall off. When brushing the waterproof paint on the ground, carefully check whether the corners and behind the pipe are painted, and the waterproof layer on the surrounding walls is coated with high meters. The waterproof layer of the ground can not be stepped on with hard-soled shoes.

    It is important to do a closed water test, go downstairs to the corresponding kitchen and bathroom 24 hours a day, and let the downstairs neighbors recognize that there is no water leakage

  3. Anonymous users2024-01-21

    It is recommended to use the brand's flexible waterproofing, which must be able to do a good job in the base layer, and must ensure that the base layer is solid, smooth, free of dust, open water, oil and other things that affect the waterproof adhesion. After the waterproof material is stirred, the construction should take the cross method, brush twice with a pig hair brush, and the yin and yang corners and nozzle positions should be brushed into an arc. Every place must be brushed in place.

    Really good waterproof materials are specially guided by technical guidance, such as Bostik, American Thunder Emperor, and Ruifeng under "Ruifeng 100%", and you can seek support from manufacturers if necessary.

  4. Anonymous users2024-01-20

    Generally speaking, when making the bathroom, the worker will wipe the waterproof mortar on the ground, if you find that the waterproofing is not done well later, you can do it again.

Related questions
10 answers2024-01-27

If you're worried about water leakage, the most direct way is to test the water. If there is a water mark on the root of the pipe, it must be that he didn't wrap the pipe for you, or he didn't make it tight. If you want to paint yourself, you can buy some polyurethane, but you don't use much of that, and most of it is sold in barrels. >>>More

9 answers2024-01-27

Make your own waterproofing and brush polyurethane waterproof paint. >>>More

4 answers2024-01-27

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

3 answers2024-01-27

Because the waterproofing of the bathroom involves the deployment of materials, the height and thickness of the painting, etc., it is not recommended for people who have no building construction foundation to operate. >>>More

2 answers2024-01-27

You can use a slightly coarser cement as a primer first, and then brush the waterproof paint after the cement is dry. But in painting money, the ground should be flat and there should be no grooves. Water is then sprinkled on the ground to expel the gas from the small holes. >>>More