The new building is delivered, and the bathroom waterproofing still needs to be redone

Updated on Bathroom 2024-09-09
1 answers
  1. Anonymous users2024-01-24

    This one is definitely going to be! Otherwise, if there is a problem in the future, you will have to knock it out and do it again! The developer won't do a good job of waterproofing for you!!

Related questions
2 answers2024-09-09

1. There are several reasons for water seepage in all bathrooms, so you must first rule out what is the specific cause and where is the source of water leakage? to determine which method can be solved. >>>More

1 answers2024-09-09

The waterproofing of the original house is called engineering waterproofing, let's treat it as if it is not. If your workers have a strong sense of responsibility, they can only use Laoyal. Of course, it would be better to finish it with a tarp and do it again with Lloyal.

7 answers2024-09-09

Generally, the new house has to be decorated, think that the waterproofing of the bathroom is generally in the original structural layer, sometimes it is inevitable to destroy, generally when decorating, the decoration company should do waterproofing, generally do 30mm, shower position 1800mm, if you are more concerned about the quality of decoration you can choose to do. When the decoration company finishes it, it is necessary to carry out a closed water experiment, which is generally two times for 48 hours at a time.

5 answers2024-09-09

Yes, because the moisture-proof of the stone is not for the sake of filial piety and waterproofing, but to protect the stone itself, because the stone is easy to break after absorbing water, and the stone waterproofing can be very good to prevent the weakness of the stone. Jane.

3 answers2024-09-09

Some waterproof coatings need to be brushed, such as acrylic waterproof coatings. However, Chenguang, this type of JS waterproof coating, does not need to be brushed, and can be directly applied to tiles.