What is the construction process of aluminum plate grating ceiling

Updated on Suspended ceilings 2024-09-11
1 answers
  1. Anonymous users2024-01-24

    The sprinkler head in the bathroom should be fixed with the wall, if it is a fire sprinkler, you can first install the sprinkler around the hanging piece, after installation, you can use a tape measure to measure the distance between the sprinkler and the surrounding hanging piece, and then use a utility knife on the back of the hanging piece to carve 5 cm diameter two circles, and the front can be squeezed by hand to get a 5 cm round hole, so that it can be installed.

Related questions
1 answers2024-09-11

If there is a suspended ceiling, a ceiling-type sprinkler is used to be located under the ceiling; If there is no suspended ceiling, the splash tray is under the bottom of the roof sheet, depending on the horizontal distance from the beam. A row of sprinklers must be added to the > combustible ceiling, which is generally sprayed up and down. For details, please refer to the "Code for the Design of Automatic Sprinkler Systems", which has 3 relevant provisions and 1 table.

1 answers2024-09-11

First pay-off, find the level, determine the position of the keel, drill holes, fix the keel skeleton, gypsum board, lock screws, kraft paper joints, batch ash.

1 answers2024-09-11

1. Construction process.

Accurate measurement, keel finishing, surface planing, half-groove lapping, flame retardant brushing, oil cleaning 2, construction plan. >>>More

2 answers2024-09-11

1. Construction process:

Boom - elastic ceiling elevation line - brush black paint above the elevation line - install water, electricity and ventilation pipes - install the surrounding mineral wool board ceiling - preliminary installation of metal grille - set the position and height of the ceiling arch - adjust the height of the fire sprinkler head according to the ceiling arch line - equipment debugging - adjust the metal grille according to the arch height - straighten the fire sprinkler head straight - install lamps and lanterns - finely adjust the grid straight and straight. >>>More

2 answers2024-09-11

The installation of aluminum plate and aluminum-plastic panel is the same, but the aluminum plate is processed and formed to the construction site, and the aluminum-plastic panel is processed and formed after arriving at the construction site, and the website of the aluminum-plastic panel manufacturer is generally available.