    Labor includes demolition, water pipe maintenance, floor tile paving three projects, demolition 40 a square, 1600, water pipe half labor, 150, floor tile paving 35 a square, 1400, the cost of finding workers by themselves: 3150

    I don't want to trouble myself, and the price is higher to find someone to do.

Related questions
7 answers2024-09-16

The bathroom is just the surface, and the sand is further down. You can't do this tool, find an impact slob, it will be done in less than half an hour, and rent a copy at the power tool store. To do waterproofing, all bricks and sand should be cleared, the pool surface should be covered with cement mortar, and the waterproof layer should be coated after drying. >>>More

1 answers2024-09-16

An auspicious day for the renovation to start.

Wednesday, September 07, 16 August Seventh Month of the First Month of the Seventh Month of the Month of the Seventh Month of the Month of the Seventh Year of the Year >>>More

6 answers2024-09-16

When the kitchen leaks, open the floor tiles and replace the leaky pipes. 4 pieces of floor tiles were not repasted, and the cement was smoothedDoes cement need to be maintained with wet water? After the cement is smoothed, wait for the cement to close the oars, sprinkle water on it, and keep it moisturized for three to four days.

4 answers2024-09-16

The problem you mentioned involves a problem of floor tile paving process, and the general living room floor tile paving adopts a dry paste process, which changes the wet practice of mortar cement. The tile does not need to be soaked in water in advance, and the base surface does not need to be wet, as long as the foundation condition of the pavement is better, so that the operation condition is greatly improved. Its adhesive effect also exceeds the traditional mortar cement, especially suitable for small and medium-sized projects and home decoration with a small working surface and an unsatisfactory working environment, that is, to use cement and sand to mix evenly in a certain proportion to do the bottom layer (often the label of this layer is not very high, and finally use plain mortar to evenly smooth and connect with the surface of the floor tiles (the label is very high, and there will be no hollow drum), so a few bricks in the center of your living room and dining room can be replaced, which will not affect the appearance, and the method is to use a hammer to knock it in the center of the brick. Then along the crack in the middle of the stripe to remove the entire surface of the bricks, and finally use a hammer to slowly knock off the concrete layer below, to remove small pieces, between the links must not be beaten with large tools, so that even if there is a water pipe below will not be affected. >>>More

1 answers2024-09-16

After 24 hours of pasting, it's okay to soak it, and it's generally okay for more than 12 hours, so it plays a role in maintenance, and it's okay to rest assured.