The house was renovated, and the workers flooded the room that was ready to be plastered with solid

Updated on Solid wood 2024-09-09
3 answers
  1. Anonymous users2024-01-24

    First of all: no problem. Don't worry.

    Because according to your idea, it is to be in the final stage of decoration to assist the floor, that should be the same as you said, there will be almost two months, it is autumn now, the moisture content in the air is very small, as long as the window is opened every day for ventilation, and ensure that the ground does not press things to hinder the evaporation of water, there is no problem at all.

    It's okay to use quicklime, but it's not necessary to use absorbent paper or something. It should not be as fast as direct ventilation.

    Sometimes, during the renovation process, the floor is washed for cleaning. So you can rest assured. There will be absolutely no problem. And remember to have the carpenter leave air vents in the floor when the floor is sub-floored. That's the key to ensure that the floor doesn't get damp back in the future.

    The moisture-proof film is used to coax people, and if you think about it, it will drive a lot of holes into the floor when you lose it, and it is useless. And even if it is useful, there will be a lot of moisture under the layer of plastic paper, and the ground will always be damp, but I am afraid that it will grow mold, which is not good for the body.

  2. Anonymous users2024-01-23

    After the surface water is cleaned, sprinkle a layer of quicklime, then spread a layer of absorbent paper, and then sprinkle dry sand on top of the paper so that the paper is fully close to the quicklime. Change it once every two days and spread it for a week.

    After a week, use absorbent paper to spread directly on the ground, spread two layers, and also sprinkle dry sand on the surface of the paper, so that the paper fully touches the ground. The paper is changed when it becomes wet, usually once a day. It is estimated that the ground will dry out in a period of about one star.

    Just in case, you can also open the windows all the way on sunny days to ventilate them.

  3. Anonymous users2024-01-22

    When laying the floor, put a layer of moisture-proof film.

Related questions
2 answers2024-09-09

If you don't know your area, it is recommended to consult with a local renovation company or ask relatives and friends if you know one.

5 answers2024-09-09

There are many people in the family, if you don't like to be clean, you still use 800 * 800 floor tiles, and the wooden floor is more difficult to clean, which is suitable for the use of the room

3 answers2024-09-09

It is very troublesome to lay the solid wood floor, but there is no problem of long construction period, and the composite floor should be laid for half a day to a day, but once it enters the site, it will definitely occupy a day and cannot do anything else, and the solid wood floor will only be laid for a day or two days, and there is not much difference in the construction period.

4 answers2024-09-09

How to choose flooring.

First, the planning before choosing the floor can not be less. >>>More

5 answers2024-09-09

: Laminate flooring is responsible for installation, and even the kicking line is included, because it does not have a floor keel, and the installation is simple and convenient; Of course, there are two situations, one is that the customer brings a carpenter, with a good size (the merchant and the carpenter will calculate how to save materials), and then the customer negotiates the price of the floor, the color of the floor, and the other is that the customer can also talk directly with the business, the merchant knows a lot of carpenters, to find one, the price must be reasonable, the key manual must be excellent!