Furniture installation construction stage method

Updated on furniture 2024-09-14
2 answers
  1. Anonymous users2024-01-24

    Didn't understand what it meant.

  2. Anonymous users2024-01-23

    Don't rush. Let's get the problem clear first.

Related questions
2 answers2024-09-14

Before installing the kitchen ceiling.

3 answers2024-09-14

The best way to report the decoration budget is to report the artificial materials separately, and the quotation should be based on the sub-region, such as the kitchen and living room. This way you can know the amount of work in each place.

4 answers2024-09-14

Labor cost 80 per square meter. Construction method: welded steel structure, aluminum veneer, specific check specifications.

3 answers2024-09-14

After the woodworking is completed, the board and the joints should be inspected, the joints should be smooth and firm, and the practical 360 mesh water sandpaper should be polished along the direction of the wood grain, and the dust on the surface of the board should be wiped with a clean brush 2After grinding and dust removal, take the Dufang second-generation sealing primer and dilute it with 30% clean water, stir evenly, evenly paint it on the surface of the wood with a wool brush, and dry it after about 4-6 hours (the surface drying time is extended when the temperature is lower than 15 degrees) 3After simple grinding with 360 mesh water sandpaper and cleaning up, the first construction of the water-based topcoat is carried out 4 >>>More

1 answers2024-09-14

If needed, it cannot be directly entered into the municipal pipe network, and it can only be discharged after sedimentation can be set up after sedimentation.