Find a waterproofing method for bathroom walls

Updated on Bathroom 2024-09-16
1 answers
  1. Anonymous users2024-01-24

    If the bathroom wall is not brushed and waterproofed, it is simply unqualified construction. Bathroom walls must be painted with waterproofing.

    It is highly recommended that you find a worker to brush the waterproofing, and the construction process of Shengdu is blue waterproof (permeable blue waterproof, do not mix with water).

    When we can solve the problem now, we will solve the fundamental problem, and don't wait for a bigger problem to arise later. And it's not a particularly troublesome thing. ~

    Good luck!

Related questions
6 answers2024-09-16

Bathroom waterproof leakage repair method: If it is caused by the leakage of the waterproof layer, then the original tile needs to be removed and the base surface cleaned. After the cement mortar is proportioned, the ground is leveled and further waterproofed. >>>More

4 answers2024-09-16

1. Ground treatment.

Before waterproofing, be sure to level the ground, if the ground is uneven, it may affect the effect of waterproofing, and may also cause cracking and leakage caused by uneven thickness of waterproof coating. Floor drains, wall corners, pipe heels and other joints should be painted with high elasticity and flexible waterproofing, because the joints between the wall and the floor of the bathroom will be displaced, and water seepage is most likely to occur. >>>More

5 answers2024-09-16

Base surface treatment: leveling, cleaning (no debris and dirty oil on the base surface), moist base surface. Pipe roots, floor drains, drains, yin and yang corners and other parts that are prone to leakage should be treated first. >>>More

4 answers2024-09-16

<> bathroom wall also needs to be waterproof, and the height should be more than 30cm, and the waterproof height of the shower area should be more than 180cm. Whether it is ground waterproofing or wall waterproofing, it must be done well when decorating, otherwise it is very troublesome to have problems with waterproofing in the later stage, and it is also necessary to knock off the decorated tiles and redo waterproofing. After doing the waterproofing, you need to do a closed water test, that is, plug the floor drain, and then put water on the bathroom floor for 24 hours, if there is no water leakage within 24 hours, it means that the waterproof is qualified, and then pave the tiles after the closed water test is passed.

3 answers2024-09-16

For the toilet waterproofing to meet the following five standards: no leakage, no water accumulation, no overflow, no water seepage, no conduction! >>>More