If the balcony is installed with an integrated ceiling and a hand cranked drying rack? Which one to

Updated on Balcony 2024-09-15
4 answers
  1. Anonymous users2024-01-24

    1. The ceiling itself cannot bear weight, and the clothes on the drying rack are very heavy, which will break or collapse the structure fixed on the top of the wall, so it must be fixed on the top surface of the original balcony such as the top of the wall (floor, beam, etc.), which is relatively safe and firm, because the load-bearing capacity of the floor is very strong.

    Balcony ceiling clothes dryer installation effect.

    2. If you install the drying rack and then hang the ceiling, the wire rope and ceiling parts of the drying rack can be hidden in the ceiling, and you can only see the rod and rope from the outside, which is more beautiful.

    3. The general decoration master let the ceiling be suspended first, in fact, he is afraid of trouble, because if the clothes pole is installed first, the ceiling will be perforated when the line is routed, so what we see is that the ceiling is hung first when decorating.

    But if the ceiling has been suspended, there is no way, then you can remove part of the ceiling, and then perforate, install, and restore the ceiling. When the ceiling is suspended, the steel screw should be reserved, so that the drying rack can be fixed on the reservation. The steel bar should be fixed to the ceiling, ensure that the length of the steel bar is 1-2 cm above the ceiling, and then install the drying rack on the steel bar, because the ceiling is not load-bearing, so it is necessary to use a load-bearing structure.

    Balcony decoration first ceiling or first install drying rack.

    Regarding the situation of installing a lifting clothes pole on the balcony with a suspended ceiling, I think it is better to install a clothes pole first, and if your home has already hung the ceiling, you can follow the above method. If there is no ceiling, it is recommended to ask the decorator to install the lifting clothes pole first and then install the ceiling. Of course, the best thing is to directly purchase the balcony ceiling with a smart drying rack, so that the installer can decorate it in place at one time, and there is no need to worry about the incongruity between the two, which can have both the aesthetics and functional practicality of the balcony top.

  2. Anonymous users2024-01-23

    You can ask the master, or ask the master of Luban to come and install it, the installation is very fast, and it will not waste your time.

  3. Anonymous users2024-01-22

    It should be determined according to the selected hanger.

    There are two active ways:

    1. If the selected hanger has a long fixed rod, you can install the hanger first, and then hang the ceiling.

    2. If the selected hanger has a short fixed rod, then the ceiling is suspended first, and at the same time, the fixed point of the hanger is installed and the wooden square is reinforced, so that the hanger is installed after the ceiling is installed.

  4. Anonymous users2024-01-21

    Pingao mall was built.

    Bai proposed to install the drying rod first and then carry out the balcony hanging zhi. Reason:

    1.Ceiling. Can't bear weight, drying dao hangers plus clothes is very back.

    Heavy ones must be fixed on the top of the wall (floors, beams, etc.) for safety.

    2. Install first and then hang the ceiling, the wire rope and ceiling parts of the drying rack can be hidden in the ceiling, which is beautiful. If the ceiling is already suspended, it is more troublesome to install a drying rack.

    If you have already installed a suspended ceiling and then installed a lifting drying rack, there are the following remedies:

    1. Remove part of the ceiling, perforate, install, and restore the ceiling.

    2. Reserve steel screws when hanging ceilings, and the drying rack can be fixed on the reserved parts.

Related questions
3 answers2024-09-15

The electric one is equipped with 4 elongated screws with a diameter of 8 to pull the headshot, and the drill bit of 12 is used to punch holes; >>>More

1 answers2024-09-15

The installer should have a high-rise ladder, or take a mobile scaffolding.

9 answers2024-09-15

Install the drying rack first and then hang the ceiling, so that it is firmer. In some cases, the drying rack is installed after the ceiling, and the fixing point of the drying rack is left first. >>>More

2 answers2024-09-15

My home decoration is 300 yuan left, used for more than a year, very good, no problem.

1 answers2024-09-15

1.Many people think that they should install balcony ceilings first, and then install lifting drying racks and curtain slides, but this view is wrong. The correct way is to install a drying rack first, and then carry out the balcony ceiling. >>>More