After the bathroom is pried open, do you have to make flowers before leveling the waterproof?

Updated on Bathroom 2024-09-17
1 answers
  1. Anonymous users2024-01-24

    The original waterproof layer does not need to be flowered, but the original waterproof layer should be checked before re-leveling, if it is because you hurt the waterproof layer after chiseling and prying, you have to repair the waterproof again before proceeding to the next process.

Related questions
6 answers2024-09-17

The bathroom must be waterproof, if the wall of the bathroom is the outer wall of the building, that is, there are no neighbors, then the side wall is also best waterproof to prevent the return of moisture in winter.

5 answers2024-09-17

Spread the cement mortar directly on top of the waterproof layer.

8 answers2024-09-17

Summary. What to pay attention to when waterproofing the bathroom. >>>More

3 answers2024-09-17

Depending on what kind of material, generally 24-48 hours after the water test, the construction can be carried out after the water test.

5 answers2024-09-17

As long as the waterproofing is done well, there is no problem.