Before waterproofing the bathroom, whether to use mortar to smooth the water pipe before waterproofi

Updated on Bathroom 2024-08-15
1 answers
  1. Anonymous users2024-01-24

    When doing waterproofing, use the plugging king to fill the gaps evenly around all the drainage pipes, if you use cement, there will be small gaps when dry, and then there are cement and PVC drainage pipes that are not combined. Doesn't work. Plugging King is a professional in these places.

    15 yuan a pack. 2 kg in a pack. Waterproof building materials are available at shops

Related questions
6 answers2024-08-15

The base layer of the wall and the ground is sanded, so it is recommended to use the professional Dawa wall closure and ground solidification to deal with it, and the wall solid and ground solid are polymer water-based curing agents. Polymer can penetrate into the cement wall, firmly block the loose particles of the cement wall, make the wall form a tight one, improve the adhesion of the wall, and avoid the wall moisture and alkali return. >>>More

4 answers2024-08-15

It doesn't matter if you don't drain clean water for 2 times.

1 answers2024-08-15

The way to teach you is to first close the main sluice gate of the water, and then use a pistol to drill into the rigid structure inside, or use a just saw to dig it slowly, and wait until it is almost time to smash it with a change cone, and smash the inside down, we have done this. Give it a try.

12 answers2024-08-15

After the bathroom is waterproofed, you need to do a closed water test, the ground is waterproof about 30 cm, and after 48 hours, see if there is any water leakage in the ceiling. If not, the next stage of construction can be carried out, and if there is, it is necessary to re-do the waterproofing and do a closed water test until there is no water leakage. >>>More

2 answers2024-08-15

Yes, you have to wait for it to dry before doing it, and the surface should also be cleaned, remember that the shower room is waterproof at least meters.