Does the bathroom waterproofing too high really affect the quality of the wall tiles?

Updated on Bathroom 2024-08-14
4 answers
  1. Anonymous users2024-01-24

    In fact, no, the first choice depends on your waterproof material selection is very important, waterproof construction if there is a hollow drum will also have an impact, the thickness of the brick mortar can not exceed the original base surface can not run anything. It's all related.

  2. Anonymous users2024-01-23

    Waterproof materials and waterproof materials are not the same The effect is definitely different, and materials with strong adhesion do not need to consider this problem at all. The specific situation will help you analyze Q6364...7859

  3. Anonymous users2024-01-22

    Waterproofing does not affect the quality of tiling.

  4. Anonymous users2024-01-21

    The waterproof side wall of the bathroom is generally brushed meters high.

    With cement mortar and tile adhesive, the base layer is required to absorb water in order to improve the quality of pasting, therefore, it is easy to paste tiles on the waterproof layer.

    It is more reliable to paste with structural adhesive on the waterproof layer, and the cost is high.

Related questions
12 answers2024-08-14

There is no impact. Remember to be sure to post it.

Tile. Before doing waterproofing, room. >>>More

2 answers2024-08-14

It doesn't matter, the empty brick is a matter of the craftsmanship of the bricker.

1 answers2024-08-14

It depends on what kind of waterproof coating it is, if it is waterproof mortar, it will not affect the tiling. The rest is hard to say......

1 answers2024-08-14

The bathroom has a small slope The location of the floor drain is the lowest The water flow is very slow It should be that the slope is too small This will not affect anything It's just a little troublesome There is water on the ground You have to drag it If you do a good job of waterproofing, there is no problem if you don't seep water down.

3 answers2024-08-14

It is a structural problem, if it is a formal project, it is impossible to be accepted, and the penetration crack is a major quality problem. In view of this situation, the bathroom must be made of flexible membrane waterproofing, and cannot be done according to the conventional JS fire prevention. First of all, the cracks are smoothed and calendered with high-grade cement mortar mixed with expansion agent. >>>More