The tiles in the living room are first on the ground or on the wall first The cement worker is to la

Updated on Living room 2024-08-26
6 answers
  1. Anonymous users2024-01-24

    According to the national norms, no matter which wall tile and floor tile are laid first, it is okay, and there is no provision for which one must be laid first. But the current practice of the same industry in the market, is to adopt the first to pave the wall bricks, and then arrange the construction in the way of the floor tiles, so arranged, the most important thing is to be conducive to the compactness of the work of the bricklayer construction work, is conducive to the coordination of the construction arrangement of the bricklayer, if the floor tiles are paved first, and then the wall tiles are paved, because the floor tiles are just paved, they can not walk and step on the brick surface before they are not dry and solid, otherwise they will cause the floor tiles to appear loose and delaminate hollow drums, so that the bricklayer can not continue the construction after pasting the floor tiles, They will be sent to other construction sites, so that workers will cause a lot of additional expenses and waste a lot of time for bricklayers in the process of traveling back and forth between different construction sites, which will increase the construction and management costs of the construction party.

  2. Anonymous users2024-01-23

    If the master has a good heart and good technique, he can first lay the wall and then the ground is the best. If you first pave the ground and then on the wall, because the material under the cushion has cement and it takes time to solidify, it can not be firmly glued on the ground, and then the wall is paved, the disadvantage is that it is easy to cause the ground to be out of shape and damage the bricks, and the advantage is that the problems on the ground can be found before delivery. If you don't have time to supervise, you let the master decide for himself, so as not to get angry and make trouble for you, but make it clear to him, and if you find that the hollow, wrong, or the seams are too obvious, you will rework.

    Don't make the relationship stiff, spend more money to get it right, that's going to live for a lifetime.

  3. Anonymous users2024-01-22

    It is to adopt the first paving of wall tiles, and then arrange the construction in the way of floor tiles, so arranged, the most important thing is to be conducive to the compactness of the work of the bricklayer construction work, is conducive to the coordination of the construction arrangement of the bricklayer, if it is the first paved floor tiles, and then paved the wall tiles, because the floor tiles have just been paved, they can not walk around and step on the brick surface before they are dry, otherwise they will lead to problems such as loosening and delamination of the floor tiles.

  4. Anonymous users2024-01-21

    For the owners of decoration, in fact, there is no need to worry too much about the problem of wall tiles and floor tiles who will lay first, as long as the construction party can reasonably arrange the construction period, can do the corresponding finished product protection work, and can ensure that the construction is carried out in accordance with the specifications to meet the requirements of tile paving.

  5. Anonymous users2024-01-20

    Of course, the wall tiles are used to move cement back and forth on the ground when the wall tiles are poured first, and the floor tiles are scratched soon.

  6. Anonymous users2024-01-19

    As long as the construction party can reasonably arrange the construction period, can do the corresponding finished product protection work, and can ensure that the construction is carried out in accordance with the specifications to meet the requirements of tile paving.

Related questions
2 answers2024-08-26

Whether it is the first to paste the floor tiles or the first wall tiles are OK, the first to pave the floor tiles or the first to lay the wall tiles, need to be decided according to the specific situation of the resident's home decoration, mainly to paste the floor tiles or wall tiles to carry out reasonable protection of the construction project, paste the wall tiles need to pay attention to the level and right angle between each tile must be done. When the floor tiles are laid, they should be subsidized in a parallel way on the side of the wall, and the brick joints should be aligned and no joints should be left.

3 answers2024-08-26

wall, but if you understand.

Remember to have them make a wall and press the floor. >>>More

3 answers2024-08-26

Lay the wall tiles first, then the floor tiles.

The general practice of the decoration company or the construction party is to lay the wall tiles first, then pave the floor tiles, and pave the floor tiles after the wall tiles are paved, which will not affect the wall tiles and do not delay the construction period, so the general construction party will adopt this approach. If the floor tiles are paved first, and then the wall tiles are paved, you must wait for the tiles to dry and solidify and then pave the wall tiles, if the floor tiles are not completely dry, you will directly pave the wall tiles, step on the floor tiles, which will artificially cause the hollowing, loosening and height inequality of the tiles! >>>More

6 answers2024-08-26

Paste the tiles first, and remember to install the door after the cabinet is installed.

1 answers2024-08-26

Lay the floor tiles first, and then scrape the walls with latex paint. It is enough to protect the ground with colorful cloth.