-
As long as the beam and column structure is not moved, it can be expanded, the bathroom is divided into dry and wet areas, try to put the wet area in the original bathroom position, when the sewer pipe is changed, the pipe should be filled with a plugging treasure, and the wall waterproof is a little higher, more than one meter eight, it is recommended that you use Yuhong JS elastic waterproof, which is more secure.
In this case, you can contact the property to coordinate and deal with it, and some pipe fittings may need to be re-glued and installed, or new pipe fittings may be updated.
It will not affect the safety of the house, but it will affect people's lives. >>>More
As long as it's not a load-bearing wall, there's no big problem with the holes not being too close to each other.
It may be that the pipe joints of the pipe well are not properly connected. It may also be on the 10th floor or above. It's not your family's problem. This should be inspected by professionals on the spot.
My house has a two-story building in the countryside, and does it have an impact on the bathroom on the second floor in the middle of the back of the house (called the Middle Palace)? >>>More