Seeking a leakage treatment plan for the toilet partly because the waterstop is made of hanging mold

Updated on Bathroom 2024-08-02
3 answers
  1. Anonymous users2024-01-24

    Remove the non-slip bricks, redo the waterproofing treatment on the ground, and then install the non-slip bricks. There are professional waterproofing ones, and you can let them do it, about 100-300 yuan.

  2. Anonymous users2024-01-23

    Beat it around with an electric hammer.

    Make a slope round mouth and then smear it with gold soup water, pour it with concrete after drying, and do waterproofing again on it after the concrete is dry!

  3. Anonymous users2024-01-22

    Knock out the tiles, including the floor tiles, and the ones on the wall should also be knocked off the meter high, hit the base layer, and use polypropylene to coat the membrane waterproofing. Then redo the topping.

Related questions
3 answers2024-08-02

Find a professional waterproofing person to handle it.

5 answers2024-08-02

Find a chisel and use the chisel to make a 2-3 cm wide annular groove around the floor drain. The depth is about 3 cm. However, if there are loose or gaps around the pipe during the slotting process, it should continue to be chiseled. >>>More

2 answers2024-08-02

We are poor, you didn't send points, conscience found to say, brush or spray with waterproof penetrant, that thing is transparent water-based, environmentally friendly, easy to use and brush directly on the bricks, (paint shops or waterproof shops are sold 0.)

6 answers2024-08-02

Do not trust the "guerrillas" on the streets. Don't use the bathroom for 3 days to see if there is a leak, if there is no leakage, it means that the water pipe is fine. If there is a leak, it is a problem with the water pipes. >>>More

3 answers2024-08-02

If the leakage is small, you can apply it with water, and if it is large, you should redo the waterproof layer (smash the original surface layer and re-do the waterproof layer, and then put the water to observe for 24 hours to see if the water is still leaking, and then re-do the surface layer if it does not leak).