How to make the kitchen waterproof

Updated on Kitchen 2024-08-20
6 answers
  1. Anonymous users2024-01-24

    The waterproofing of the kitchen and the waterproofing of the bathroom are basically the same, and it is recommended to use mortar waterproofing agent, but the kitchen does not have a backfill pit, so apply plain mortar on the cement-based surface first, and then make waterproof mortar. The floor is all done, the wall is 30 cm high, and the waterproof area behind the vegetable sink is 50 cm above the water outlet.

  2. Anonymous users2024-01-23

    The requirements of the kitchen waterproof standard are that the ground needs to be done all, the wall is 30 cm high, and the waterproof area behind the vegetable sink is 50 cm above the water outlet. In this way, the whole painting is applied 2-3 times, and the thickness can be controlled in between.

    Finally, after the waterproof layer is completely dry, you need to do a closed water test for 48-72 hours, and if there is no problem, you can carry out the process of tiling and other processes.

  3. Anonymous users2024-01-22

    Clean the ground first, preferably with cement leveling, so that the water can flow to the floor drain. Then apply two times with a water-based waterproof brush. It's OK to test the water without leakage

  4. Anonymous users2024-01-21

    There is no need to make the ground waterproof, and the wall is very OK if the brick is beautiful and hygienic.

  5. Anonymous users2024-01-20

    Generally, JS coatings are environmentally friendly and pollution-free, as long as the corners of the pipe root and nozzle are basically no problem

  6. Anonymous users2024-01-19

    A professional waterproof company does it professionally, or is it better to do it? Insurance?

Related questions
1 answers2024-08-20

Old-fashioned asphalt and modern waterproofing! After the old-fashioned bar asphalt is paved, it is then covered with linoleum paper, and the root of the wall should be 1,5m high to pave waterproof.

4 answers2024-08-20

The bathroom is waterproof, the ground needs to be done, the wall should be at least meters, and it is recommended to do it with full height. The kitchen waterproof floor is all done, the wall is back to the height of the meter, and the waterproof height behind the vegetable sink is above the water outlet. >>>More

3 answers2024-08-20

1. Since the waterproof layer is not exposed on the surface, when doing waterproofing, you must first find the previous waterproof layer. >>>More

4 answers2024-08-20

Yes, you don't need to plan, it will work very well. Fill the hole with some good waterproof paint, the junction of the old and new ground, post a little cloth, good JS waterproof paint is elastic, but remember to wait for the base layer to dry after painting, I hope it can help you.

1 answers2024-08-20

Kitchen and restroom In addition to waterproofing the floor, the height of the drain wall must be Kitchen meter Toilet meter. >>>More