How to make the old bathroom waterproof

Updated on Bathroom 2024-08-13
4 answers
  1. Anonymous users2024-01-24

    1. Bathroom waterproof construction steps.

    Step 1: You can use a slightly coarser cement to base the foundation first, and then brush the waterproof paint after the cement is dry. But in painting money, the ground should be flat and there should be no grooves. Water is then sprinkled on the ground to expel the gas from the small holes.

    Step 2: Mix the powder and liquid material evenly, and brush the bubbles if there are bubbles when brushing the paint.

    Step 3: When brushing the paint, brush it from the same direction, wait 1-2 hours, and then brush the second coat. When brushing the second layer, the direction of the brush should be opposite to that of the first layer, so that the best coverage can be achieved.

    Step 4: You can brush it several times, which can increase the density and fill the gaps. Some people think that the more layers of waterproof paint the better, or even brush six or seven layers, but in fact, this is not good, the paint is too thick and easy to crack.

    Step 5: Wait for one day before taking a waterproof test.

    Step 6: When doing the waterproof test, you should first fight with your downstairs neighbor.

    Say hello, then plug the drain, fill the ground with water, and wait an hour to ask your downstairs neighbor if there is a leak. If there is a water leak, the waterproofing layer should be rebuilt. If the waterproof test is qualified, it can be tiled.

    2. Precautions for waterproofing in the bathroom.

    1. In order to ensure that the bathroom floor is flat, it must be leveled with cement mortar, and then waterproof, so as to avoid leakage caused by uneven thickness of waterproof coating.

    2. After leveling, when carrying out the construction of the waterproof layer, it is necessary to pay attention to fire prevention and waterproofing.

    3. When doing waterproof construction, the floor drain, pipeline, and wall hole should be carefully inspected, and the root of the pipeline must be caulked according to the requirements during construction. 4. The waterproof treatment of the wall should also be noted, if the wall and the bathtub are adjacent, then the waterproof treatment height should be higher than the upper edge of the bathtub, and the shower should reach a height of 180cm.

    5. Before doing waterproofing, pay attention to the correct position of the floor drain elevation.

    6. To ensure that the sewer is smooth, the sewer pipes in the bathroom, including floor drains and toilet sewer pipes, must be kept unobstructed.

  2. Anonymous users2024-01-23

    If you don't know what kind of water seepage, if you want to make it simple, then cut the floor tile joints, around the foot of the wall and around the nozzle, and then fill in the waterproof material.

  3. Anonymous users2024-01-22

    To ensure that there is no leakage under the floor tiles, and then the original floor tiles can seep waterproof, and then buy a good caulk to fill the wall tiles, especially around the shower

    If the sewer pipe is leaking, you have to remove the floor tiles.

  4. Anonymous users2024-01-21

    How to do waterproofing without destroying the floor tiles???

    I have to tear it down...

    The floor of the bathroom is not big, and it doesn't cost much to smash it.

Related questions
9 answers2024-08-13

How do you make a bathroom waterproof? Let's find out.

Bathroom waterproofing needs to be painted with waterproof paint twice, the first waterproof coating needs to ensure that it is firmly combined with the base layer, and then brush the second time after the first paint is dry, and then carry out a closed water experiment after completing the brushing, and observe that there is no leakage before it is completed. >>>More

6 answers2024-08-13

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

1 answers2024-08-13

To do a good job of ground waterproofing: before laying floor tiles, we must do a good job of waterproofing engineering; After the tile is laid, it is necessary to ensure that the brick surface has a drainage slope (generally about 1% is appropriate), and the slope is towards the floor drain, which is conducive to wastewater discharge. >>>More

6 answers2024-08-13

1.The waterproof layer of the kitchen, the ground is all waterproof, the wall is 30 cm high, and the waterproof of the water, such as the dishwasher, shall not be lower than the water range. >>>More

5 answers2024-08-13

1. Bathroom waterproof construction steps.

Step 1: You can use a slightly coarser cement to base the foundation first, and then brush the waterproof paint after the cement is dry. But in painting money, the ground should be flat and there should be no grooves. Water is then sprinkled on the ground to expel the gas from the small holes. >>>More