The toilet pipe in the bathroom changes its position, how much does the ground need to be raised, an

Updated on Bathroom 2024-08-18
1 answers
  1. Anonymous users2024-01-24

    Look at the specific displacement distance.

    Pipe diameter + displacement inclination + brick thickness + concrete layer thickness.

    Hope it helps.

Related questions
25 answers2024-08-18

It is actually possible to change the bathroom space setting, but according to the size of your bathroom, consider whether you can change it, as long as you do a good job of waterproofing and consider the discharge of sewer pipes. If the property management does not apply for a construction permit, it can require the relevant documents to be presented.

4 answers2024-08-18

If it's your own house, that's no problem. If there are several households downstairs, it is more difficult. Who wants to have someone else's bathroom on top of Wu Jianjing's room. You can have ways to move walls and make the bathroom bigger. You tell me. See more answers

4 answers2024-08-18

Judging from what you said, it should be a new house to buy. And the flat position of your own bathroom will definitely meet your requirements for moving the toilet in both directions. Then what you need to solve is the sewer pipe problem. >>>More

3 answers2024-08-18

Why change the 110 tube to the 75 tube? Buy a squatting toilet The nozzle is directly compared with the nozzle, and it is clear at a glance how much it has improved......In addition, if you raise predators in squatting, you need to be cautious ...... peeing

2 answers2024-08-18

If you want to change the location of the floor drain, the key is to see whether the downstairs is decorated, if there is no decoration, you can discuss the bathroom want to leave the position of the floor drain to open up the floor, and then connect to the main sewer, if the downstairs has been decorated, then it is slotted on the ground, where is it needed, and then connected to the position of the original sewer (the key point is to let the floor drain mouth after the change must be higher than the original, there is a certain slope), after the change, you must remember to do a good job of waterproofing, the overall waterproof of the bathroom must be done, and the waterproof is 30 meters high, The wall with a shower is OK.