The bathroom pit pipe should not be higher than the floor tiles

Updated on Bathroom 2024-08-08
1 answers
  1. Anonymous users2024-01-24

    It should be 10 cm higher than the floor tiles, and when installing a flush toilet, you can cut off the part according to the situation.

Related questions
3 answers2024-08-08

Bathroom tiling, floor tiles.

It is necessary to leave a slope to facilitate drainage and not accumulate water! >>>More

1 answers2024-08-08

Whether the bathroom is a wall tile or a floor tile or a wall tile, the state does not give regulations, but the actual construction process is to paste the wall bricks in the floor tiles, so that the construction will not be delayed.

2 answers2024-08-08

We have opened the window in our house, and we have also opened a small window and installed an exhaust fan.

2 answers2024-08-08

Need. The bathroom floor has not been remodeled, and it needs to be re-waterproofed. >>>More

3 answers2024-08-08

The original floor tiles should be knocked out and then re-smeared with cement. It cannot be overridden directly.