Build a house at home, prepare three and a half floors, frame structure, how to count columns and be

Updated on Living room 2024-08-16
2 answers
  1. Anonymous users2024-01-24

    How big is the area? ......Please introduce the length and width of several meters each), the orientation, the design requirements, the surrounding conditions of the foundation, ......

  2. Anonymous users2024-01-23

    It is best to design a house according to the shape of the mountain and the qi, which can turn the bad into auspiciousness.

Related questions
1 answers2024-08-16

Now the construction of houses in rural areas has begun to use steel structure houses! Most of our side are short construction period, seismic insulation and other performance! ~

2 answers2024-08-16

The toilet should be in the southeast corner, the southeast position, the hexagram position Xun, belonging to the wood, and the east belongs to the same position of the green dragon, Wang Wenchang, conducive to seeing water, suitable for making water outlets. >>>More

2 answers2024-08-16

No, the toilet should be placed in the northwest corner of the house. (Facing the direction of the house).

2 answers2024-08-16

A complete set of formal building construction drawings cannot be drawn by one person, because there are many professional drawings, including structural drawings (computer calculations are required), civil engineering drawings, electrical drawings, water supply and drainage drawings, gas supply drawings, and also include equipment and materials table (all equipment and materials for building houses, excluding tools and equipment used by the construction team, yellow sand cement, steel bars, wires, all kinds of pipes, wood, switches, etc. are indispensable) and various professional calculation books (not to pat the head to draw, to have a basis, such as the thickness of the steel bar, the number of cement, the thickness of the wire, the capacity of the switch, the thickness of the various pipes, and the number - the length and the number, can not be wasted, can not be insufficient, and so on. If you do it carefully, you should also calculate the cost (make an estimate of the budget of each specialty---including labor costs, management costs, equipment and material costs, transportation costs, unforeseen costs, etc.), so that you have a bottom and how much it will cost in total. >>>More

4 answers2024-08-16

The span is too large, you should set up a cross girder in the middle, the size is at least 250*600, and the lower rib of the beam is at least 22, and it is recommended to use 25 and not less than 4. The top plate is 10 pieces, and the thickness of the plate is 12 cm! Now that it's covered, it is recommended that you add a steel column in the middle, which may affect the aesthetics a little, but it is a little safer!