Seek a simple decoration design of one or two bedrooms and two living rooms, the kitchen and dining

Updated on Kitchen 2024-08-19
1 answers
  1. Anonymous users2024-01-24

    There is nothing special to change, if you want to save money, you can buy all the main materials yourself, do not contract to the decoration company, including doors, hardware, kitchen cabinets, tiles, latex paint, wood floors, and then other flooring, waterproofing, water and electricity renovation let the decoration company do it. The premise is to calculate the area of the house and so on, and you can also look at other people's decoration diaries on the Internet and do your homework.

Related questions
2 answers2024-08-19

Please tell us a little bit about yourself, including the size of the house (length and width), orientation, design requirements, the perimeter of the foundation, ......

3 answers2024-08-19

Two methods, the first is to plane the floor tiles and repair the pipe, and the second is to find the source of the pipe, and then go to the open pipe after pinching, the first method is a little troublesome, but the aesthetics are good, and the second is simple, but not beautiful, each with its own advantages and disadvantages.

2 answers2024-08-19

Hello, it is recommended that you find a few relatively well-known companies in the local area with after-sales warranty service numbers in the later stage of construction design.

3 answers2024-08-19

Please tell us a little bit about your situation, including the orientation of the house, the design requirements, the surrounding conditions of the foundation, ......Then design according to the conditions and requirements.

4 answers2024-08-19

If the water and electricity are not too complicated, the work is about 2000, the floor tiles are 50, not counting the kitchen and bathroom about 60 square meters, and 80 pieces (including loss) are needed for 700 doors and 4 doors (not counting the entrance door) about 3000, and the oilman, 3000-4000 wins! In this way, 2000 + 4500 + 3000 + 4000 + 1500 (paving manual) = 15000