Do you need to make the top of the bathroom waterproof?

Updated on Bathroom 2024-08-19
7 answers
  1. Anonymous users2024-01-24

    First, it is necessary to do the leveling layer. First of all, the ground should be leveled with cement mortar (especially for rerenovated houses), and then waterproofing. This avoids the waterproofing coating leaking due to uneven thickness or puncture of the waterproofing membrane.

    Second, we must do a good job in key parts. The joints between the wall and the floor, as well as the joints between the water and sewer pipes and the ground, are the most problematic areas. Therefore, these parts must be paid special attention to, and the treatment must be meticulous, without the slightest sloppiness.

    Third, the wall should also be waterproof. In order to achieve a better waterproof effect, the wall of the general bathroom should also be waterproofed about 30cm high to prevent water from penetrating the wall. The wall adjacent to the bathtub should also be waterproofed at a higher height than the top edge of the bathtub.

    Fourth, do a waterproof test. After the waterproof construction is completed, all the sewers of the bathroom should be blocked, and a "low wall" should be built at the door of the bathroom for water injection test, and the water injection height should be about 20cm. After 24 hours, if there is no leakage on the walls and floors around the bathroom, it means that the waterproof quality of the bathroom is very good.

    On the contrary, it is necessary to find out the leakage point and carry out repairs.

  2. Anonymous users2024-01-23

    My home has just been renovated, my own bathroom does not need to do waterproofing, just need to do a good job of the ceiling (it is recommended to do aluminum gusset ceiling, easy to disassemble, convenient for subsequent warmers and other items), if the bathroom leaks, you can inform your upstairs neighbors, let them deal with it, if the loss is caused, you can make a claim.

  3. Anonymous users2024-01-22

    What do you do with waterproofing your roof? I'm afraid of leaking upstairs! Normal is not done! The waterproof of the bathing place is about 2 meters, and the rest of the place is 30 cm high from the ground!

  4. Anonymous users2024-01-21

    The bathroom is generally made of the ground, mainly depending on how well the waterproofing on the upper floor of your house is done! If the waterproofing upstairs is not done well, your house is out of luck. If you don't do a good job of waterproofing the ground, you will be found downstairs.

  5. Anonymous users2024-01-20

    The top is generally not waterproof, generally the ground, the wall is 30 centimeters above the ground, and the rain area is 1.8 meters high.

  6. Anonymous users2024-01-19

    There is no need to do waterproofing, it is best to use moisture-proof materials for surface decoration.

  7. Anonymous users2024-01-18

    It's not necessary, the upstairs must have done a leakage test before the decoration, and the renovation will start without a problem.

Related questions
2 answers2024-08-19

The reason why we all know that the bathroom needs to be waterproof is because the bathroom is a necessary place for home life, and it has a shower room, so this area will inevitably lead to a large area of water flowing to the ground and then losing from the floor drain during the later use process, so the waterproof thing is produced to ensure that the water will not leak to the lower floor; >>>More

4 answers2024-08-19

<> bathroom wall also needs to be waterproof, and the height should be more than 30cm, and the waterproof height of the shower area should be more than 180cm. Whether it is ground waterproofing or wall waterproofing, it must be done well when decorating, otherwise it is very troublesome to have problems with waterproofing in the later stage, and it is also necessary to knock off the decorated tiles and redo waterproofing. After doing the waterproofing, you need to do a closed water test, that is, plug the floor drain, and then put water on the bathroom floor for 24 hours, if there is no water leakage within 24 hours, it means that the waterproof is qualified, and then pave the tiles after the closed water test is passed.

7 answers2024-08-19

Bathrooms, kitchens, and balconies all need to be waterproofed. The waterproofing of the bathroom is best done by the wall. Bath, shower or something, it's necessary.

2 answers2024-08-19

The whole bathroom does not need to do any waterproof treatment, the chassis will never leak at one time, and the wall will not be permeable, so as to avoid the problem of traditional bathroom floor leakage and wall infiltration, and the whole bathroom solves the problem of toilet breakdown and leakage as a whole.

8 answers2024-08-19

The hairdresser made it waterproof, but it was very watery. The national law stipulates that each bathroom should be waterproofed before the house is handed over, so the developer does make waterproof for each room. But why do you need to do a waterproof in the decoration process? >>>More