Why should the bathroom floor of the renovated house be soaked with water?

Updated on Bathroom 2024-08-26
2 answers
  1. Anonymous users2024-01-24

    After the leak-proof is done, fill it with water and try to see if it is leak-proof, otherwise you will think about it and do it foolproof.

  2. Anonymous users2024-01-23

    After the waterproofing is done, it is necessary to test whether there is water leakage, and generally test whether there is water leakage downstairs two days after being filled with water, and only after confirming can it be tiled.

Related questions
1 answers2024-08-26

It is impossible to be 1 meter lower, if it is 1 centimeter lower, it is normal, and its main purpose is to prevent water leakage in the bathroom and backflow into the living room and bedroom. Architecturally reasonable.

3 answers2024-08-26

The house is decorated, the bathroom floor is high and low, and there is nothing special about feng shui.

5 answers2024-08-26

The main reason is that the weight of the cinder itself is relatively light, and in order to reduce the local weight, it is easier to clean up in the future.

3 answers2024-08-26

1. The weight of ceramsite concrete is light, its dry bulk density is 800---1900KG M3, which is 2 3-1 5 lighter than ordinary concrete, and the label can reach CL5---CL60, due to the light weight, the foundation load can be reduced, so the weight of the whole building can be reduced; >>>More

2 answers2024-08-26

The problem can be solved by the following methods:

1. The dry one cannot be bonded with cement and cannot be firmly adhered to. >>>More