The new home will be renovated immediately, especially if you want to consult, when the bathroom is

Updated on Bathroom 2024-08-24
6 answers
  1. Anonymous users2024-01-24

    The moisture-proof and waterproof of the bathroom cannot be ignored and must be in place.

    First of all, the top surface is moisture-proof and covered, and the most important thing is to cover it. When decorating the top of the bathroom, it is necessary to pay attention to preventing water vapor, so it is best to use PVC gusset with good waterproof performance. Then there is the treatment of the wall, the wall of the bathroom is the most prone to infiltration.

    Choosing a tile with good waterproof performance is the first step in wall waterproofing, if you use ordinary tiles, you have to paint waterproof paint on the back of the tile to do a good job of waterproof treatment.

    AAG protective solution is colorless, non-combustible, and will protect the original color of the wall, and has a strong effect on stain resistance, anti-immersion and moisture-proof. It can completely eliminate the phenomenon of water immersion, peeling, mildew, and hair growth on the walls of the home. Due to its simple construction and low cost, it can be applied to any family, and it can be used on existing paint surfaces, tiles, mosaics, mushroom stones, crystal sandstones, marble and other materials.

    AAG paint is also widely used in exterior wall construction, which also solves the problem of water immersion from the root. Because the exterior walls are no longer flooded, the peeling problem of the interior walls will be completely solved.

    AAG moisture-proof series products are mainly products of "water-based fluorocarbon nano impermeable protective liquid", among which the protective effect of "toilet anti-dipping adhesive" on toilet waterproofing cannot be underestimated, which makes the owners once and for all, and also makes developers and property managers sit back and relax, and greatly reduces the cost of housing maintenance. The waterproofing is thorough and effective, and the waterproofing and impermeability in the true sense are realized.

    1. The construction is simple, different from the traditional waterproof and anti-immersion products, the anti-immersion effect is obvious, and the maintenance time is long.

    2. In the construction base surface, the tiles can be paved after drying, and the construction period is short.

    3. There is no need to make a protective layer on the waterproof layer.

    4. In the process of tile paving, the waterproof layer should not be injured.

  2. Anonymous users2024-01-23

    The biggest hidden danger of the bathroom is the problem of water, waterproof must be done well, the national standard of wall waterproofing is meter high, and it is more reliable to do the upper point of the ceiling. The cost is relatively high, but there are no sequelae. It can prevent the wall next door from getting damp in the future.

    Ground waterproofing and wall waterproofing are done together, after waterproofing, to do the closed water time, is to put water on the ground 5 to 10 cm high, 24-48 hours later to see if there is water seepage on the top surface of the downstairs, no water seepage on the pass. Waterproofing is after the pipeline is laid and before the tiles are laid.

    The water supply system and drainage system are also critical, as long as the master points out the problem carefully, the probability is relatively small. In addition, it is better to use a good PPR pipe for water supply.

  3. Anonymous users2024-01-22

    It's almost finished, but hasn't the bathroom been installed yet?

    The general decoration should be done first water and electricity transformation, the bathroom part should pay attention to the most waterproof problem, otherwise it is very troublesome to often leak downstairs when taking a bath.

    Do a good job of waterproofing, fill the bathroom with water, wait 48 hours, go downstairs to the neighbor's house to ask if there is any leakage, if not, you can lay tiles.

  4. Anonymous users2024-01-21

    1 The most important thing is the waterproofing of the ground.

    2 Leave enough hot and cold water outlets in the bathroom.

    3 Consider the way you warm your bath.

    4 The height of the shower mixer spout and the distance from the center of the spout.

    5. Whether the direction of the water in the ground can automatically flow to the floor drain.

  5. Anonymous users2024-01-20

    Cold and hot water are in place, and the floor and walls are waterproofed, which is a must, and remember to leave a spare socket near the washstand.

  6. Anonymous users2024-01-19

    Generally, there is no sanitary dead angle in the visual view, there is no odor in the sense of smell, there is no flushing noise in the hearing, and whether you want to move the position of the toilet and whether the layout is reasonable! ~~

Related questions
2 answers2024-08-24

If the cost of furniture is tight, it is recommended to add it gradually. >>>More

5 answers2024-08-24

The problem you said has nothing to do with the renovation team, the developer property is willing to undertake the pipe repair, that should be, but as for your tiling and toilet responsibility, in my opinion, you can only solve it yourself, after all, you are the only one who has the problem, and you can't make a claim for the property in this situation.

3 answers2024-08-24

What style do you prefer? If you are buying furniture, measure the size of the furniture first. Otherwise, if you buy big, you can't put it down, and if you buy small, you will be stingy. There are also styles and materials according to their favorites. In terms of price, it depends on your financial ability to buy it.

2 answers2024-08-24

It is recommended that you go to Yijiali wood to go around, because my furniture is customized there, not bad, they have more styles, the most important service is better! >>>More

2 answers2024-08-24

After the kitchen is renovated, there will generally be cabinets, find a position in the lower part of the cabinet, and make a hole from the outside to install it, or in other words, cut off a piece of the inner board inside to install, which will not affect the appearance.