The bathroom uses Guoerjia paint to do waterproofing, what is the construction process

Updated on Bathroom 2024-08-08
1 answers
  1. Anonymous users2024-01-24

    Base treatment, cleaning, leveling layer, bonding layer, detail additional layer, acrylic waterproof layer, water storage test, protective layer construction, secondary water storage test.

    1.The elevation of the kitchen and bathroom should be checked correctly, and special attention should be paid to the correct elevation position of the floor drain.

    2.The quality of the wall hole at the root of the floor drain and pipeline should be carefully inspected, the wall hole should be dense and qualified, and the root of the pipeline must be caulked according to the requirements during the construction of the leveling layer.

    3.The yin and yang angles should be made into an arc, straight and flat.

    4.Screed construction: If there are voids, cracks, and unequal defects on the base surface, repair and smooth them with cement mortar. The base surface must be firm, flat, clean, free of dust, greasy, wax, release agent, etc., and other debris substances.

    5.The construction of the waterproof layer can only be carried out after the screed is dry, and the construction should be fireproof and waterproof during the construction. Construction workers should wear soft-soled shoes.

    6.After the waterproof layer is completed, the finished product should be protected, and no one should walk around. After the inspection is confirmed, the concealed project acceptance visa can be applied for, and the next process construction can be carried out.

    7.After the waterproof construction is completed, the water storage test is carried out, and no leakage is considered qualified after more than 24 hours. After the installation of the equipment is completed, the secondary water storage test is carried out.

    8.The toilet is a lowering plate treatment or a caisson structure toilet, which also needs to be treated as follows:

    The construction method of caisson toilet is as follows:1The sunken ground first does two waterproofs, one is rigid and the other is flexible.

    A: And. Do a 48-hour closed water test, B:

    A 20 mm diameter round hole is opened at the lowest part of the riser and the toilet caisson floor, and a 20 diameter pipe is inserted into the opening to a depth of 4 mm. The drain pipe points to the center of the toilet caisson bottom plate, which is convenient for the installation of the toilet caisson waterproofer, C: make a protective layer on the waterproof coating without leakage with cement mortar, which is required to be high all around, and the position of the installation of the waterproof body is the lowest, and the cement mortar protective layer is --- 2

    Install the upper and lower sewer pipes. Install the waterproof body and cover the body with pebbles to ensure that the water in the caisson can be drained to the riser smoothly 3The sand fill pile is compacted to 5 cm below the ground.

    4.Cover the cement and fill the level. 5.

    Then do a good job of waterproofing the threshold of the bathroom. 6.Floor tiles.

Related questions
2 answers2024-08-08

Toilet waterproofing process.

When the base surface is uneven, it needs to be repaired. Yin and yang corner areas, bends and other uneven needs to be leveled, as well as the removal of parts should be repaired and smoothed first, if there are cracks and seepage parts of the base, appropriate plugging methods should be used to repair first. >>>More

2 answers2024-08-08

1.When the base surface is uneven, it needs to be repaired. Yin and yang corner areas, bends and other uneven needs to be leveled, as well as the removal of parts should be repaired and smoothed first, if there are cracks and seepage parts of the base, appropriate plugging methods should be used to repair first. >>>More

2 answers2024-08-08

The best waterproof material for waterproofing in the bathroom is to use polymer cement-based waterproof coating slurry. >>>More

1 answers2024-08-08

What are the steps of waterproof construction of home decoration, kitchen and bathroom? Base treatment, detailed node treatment, 1st transverse painting, 2nd longitudinal painting, 48-hour closed water test after drying, other finishes installed (pay attention to protect the waterproof layer). >>>More

1 answers2024-08-08

How to construct has nothing to do with what waterproof material is used, because the leakage situation in each place is different, it is recommended that you find a professional waterproof master, and go to the site to see what the problem is, in order to judge how to construct.