What problems need to be paid attention to in the secondary waterproofing of the bathroom?

Updated on Bathroom 2024-08-08
4 answers
  1. Anonymous users2024-01-24

    The secondary waterproof floor tiles do not have to be knocked off, and they can be sprayed directly on the surface of the floor tiles with waterproofing agent, which can be guaranteed for life.

    Pay special attention to the roots of pipes, walls, and other objects, and make sure they are in place.

  2. Anonymous users2024-01-23

    The waterproof material must be used well.

  3. Anonymous users2024-01-22

    If there are floor tiles in the bathroom, they should be removed first, and the things inside should be removed, and then see if the ground is flat. You can do secondary waterproofing!

  4. Anonymous users2024-01-21

    The renovation of the new home and the maintenance of the old home may have been overlooked; Waterproof and leak-proof solutions for bathrooms and kitchens! The waterproof and leak-proof project is a concealed project in the entire construction project. As important as fire engineering.

    However, it rarely arouses personal concern. In the construction, waterproofing construction or symbolic construction is basically omitted for the sake of profit. It doesn't work waterproof at all!

    At present, 95% of the waterproofing projects of real estate (national) buildings have the following problems:

    1.Improper design of waterproofing materials (waterproofing materials are selected according to the building structure) 2The foundation treatment of the waterproof surface is unqualified (the waterproof layer has very strict requirements for the foundation) 3

    Serious tofu slag works. (Formality.) Symbolic waterproofing construction.

    The quality is undetectable) 4.Widespread cutting corners.

    Improper waterproofing treatment will have the following symptoms:

    1.Damp walls (The walls of the kitchen are damp all year round. It is also accompanied by a little spotted mold. Anything against the wall is scrapped)

    2.The floor is moldy (

    3.Water seepage on the exterior walls.

    4.The roof is leaking.

Related questions
3 answers2024-08-08

Nowadays, when many people are renovating the bathroom of a second-hand house, they are considering installing a bath bomb in the bathroom, but is the bath bomb safe? Let's share with you some of the safety hazards of second-hand housing bathroom renovation and bath bombs! >>>More

3 answers2024-08-08

1. The bathroom floor is leveled first. If you're replacing the floor tiles in the bathroom, be sure to level the floor with cement mortar before waterproofing it after chiseling off the original tiles. This avoids leakage of the waterproofing coating due to uneven thickness. >>>More

1 answers2024-08-08

1. Bathroom waterproof construction steps.

Step 1: You can use slightly coarser cement as a primer first, and wait for the cement to dry before brushing the waterproof coating. But in painting money, the ground should be flat and there should be no grooves. Water is then sprinkled on the ground to expel the gas from the small holes. >>>More

2 answers2024-08-08

No matter what material is used, it is generally waterproof with paint, and it is worth noting that you need to pay attention to the construction! Before waterproofing construction with polymer coatings, the base must be cleaned up, that is, the construction must be cleaned up in the bathroom, the original sand and gravel dust must be cleaned up, and then waterproof after drying. Finally, it is also very important to pay attention to the bathroom will generally be backfilled with fine sand, and you must pay attention not to be destroyed by sharp pebbles when backfilling.

3 answers2024-08-08

1. The bathroom floor is leveled first. If you're replacing the floor tiles in the bathroom, be sure to level the floor with cement mortar before waterproofing it after chiseling off the original tiles. This avoids leakage of the waterproofing coating due to uneven thickness. >>>More