What should I pay attention to when re waterproofing the bathroom at home?

Updated on Bathroom 2024-04-28
3 answers
  1. Anonymous users2024-01-23

    1. The bathroom floor is leveled first. If you're replacing the floor tiles in the bathroom, be sure to level the floor with cement mortar before waterproofing it after chiseling off the original tiles. This avoids leakage of the waterproofing coating due to uneven thickness.

    2. The seams should be painted in place. The joints between the walls and floors of the bathroom and the joints between the water and water pipes and the floor are the most problematic areas. In the construction, you must urge the workers to deal with these corners and corners, and all waterproof coatings must be applied "in place".

    3. Wall treatment is also very important. In the general toilet waterproofing treatment, the wall should also be made about 30 cm high waterproof paint to prevent water from penetrating the wall. However, if the wall of the bathroom is a non-load-bearing lightweight wall, the entire wall should be coated with waterproof paint.

    If you have a two-fan shower screen in your home, the two walls that are connected to each other should also be fully painted. If you use a bathtub in your home, the wall adjacent to the bathtub should also have a higher height of the waterproof paint than the top edge of the bathtub.

    4. The waterproof test must be done. After the construction of the toilet is completed, all the sewer in the toilet is blocked, and a 25 cm high "barrier" is built at the door, and then 20 cm high water is poured into the bathroom. After 24 hours, you will check the surrounding walls and floors for leaks.

    This 24-hour waterproof experiment is the key to ensuring the quality of the toilet waterproofing project, and you must do it.

    5. Keep the water smooth. All sewer pipes in the bathroom, including floor drains, plumbing pipes for sanitary ware, etc., should be kept unobstructed. Only in this way can we fundamentally avoid the tragedy of the "flooding of the Seventh Army."

  2. Anonymous users2024-01-22

    Regarding the waterproofing of the bathroom, I can give you the following suggestions::

    1.The first thing to pay attention to when doing waterproofing in the bathroom is the choice of waterproof materials, and it is recommended that you can directly use the waterproof slurry in the kitchen and bathroom, which is specially developed for the yin and yang angles that are easy to seep into the kitchen and bathroom, wear pipes, sanitary ware, floor drain peripherals, etc., so the special materials are dedicated, the pertinence is stronger, and the waterproof effect is of course better.

    2.The construction of waterproofing should be carried out in accordance with the requirements of the manual, the proportion of waterproof materials, the standard thickness and height of construction, etc., so as to ensure a good waterproof effect.

    3.After doing a good job of waterproofing, it is necessary to do a good job of sprinkling and maintenance in the later stage, and places with direct sunlight need to be covered and covered.

    4.The base surface before waterproofing must be cleaned, there can be no oil and dust, etc., and it must be sprinkled with water to moisten, but there must be no stagnant water.

    5.After the waterproofing is completed, remember to do a 48-72 hour closed water test to check whether there are any leaks in the waterproof construction and whether the waterproof function is normal.

  3. Anonymous users2024-01-21

    What should be done to waterproof the bathroom, and what need to be paid attention to.

Related questions
1 answers2024-04-28

1. Bathroom waterproof construction steps.

Step 1: You can use slightly coarser cement as a primer first, and wait for the cement to dry before brushing the waterproof coating. But in painting money, the ground should be flat and there should be no grooves. Water is then sprinkled on the ground to expel the gas from the small holes. >>>More

3 answers2024-04-28

It needs to be redone, because in the process of reinstalling the bathroom, the worker master will not guarantee that it will not destroy the waterproof layer that was done before, if you are on the first floor, you don't have to do it again, if it is not the first floor, it is recommended to redo it, because once the water leaks and has to be renovated, the loss caused is not a little bit, and the current waterproof is not too expensive.

14 answers2024-04-28

Summary. It depends on the situation, generally speaking, if it is a waterproof layer damage caused by water seepage, in fact, it is very simple to solve it, as long as you buy some anti-permeability waterproofing agent, pour it on the drip and river surface after the water according to the instructions, wait until the waterproofing agent dries naturally, and wait until 24 hours to clean up the solid waterproofing agent on the tile. >>>More

4 answers2024-04-28

If the bathroom leaks, it can be redone for waterproofing, waterproofing of water pipe grooves, and moisture-proof ceilings. >>>More

2 answers2024-04-28

Generally, it is about 2,000-3,000 yuan. Including the cost of smashing, pulling away garbage, the cost of waterproof contractors, buying tiles, waterproof coatings and labor costs, the overall price is generally about 2,000-3,000. However, the price is different in different places, and the cost of labor and materials is also different, resulting in the overall cost of the cost will be different, which should be decided according to the economic situation of the family.