How many days can I do a second closed water test after laying floor tiles in the bathroom in winter

Updated on Bathroom 2024-08-15
3 answers
  1. Anonymous users2024-01-24

    Generally, a second closed water test is done every four days.

  2. Anonymous users2024-01-23

    4 days is fine. It still needs to be determined according to the local temperature.

  3. Anonymous users2024-01-22

    It is advisable to do it again next year, and if the base layer is not dry or frozen, the results may not be correct.

Related questions
7 answers2024-08-15

Bathroom floor tiles, personal opinion is to try to do as long as possible. >>>More

2 answers2024-08-15

I am also in the process of renovating, and the renovation company suggested that it would be better for me to do other projects five or six days after the bricklaying was completed.

3 answers2024-08-15

The room that has been paved with floor tiles should not be waterproofed, otherwise it will pollute the surface layer of the floor tiles and have no due waterproof effect. I hope my answer can help you.

5 answers2024-08-15

1. Knock off the paved bathroom floor tiles, choose your favorite color and pattern and re-pavement. >>>More

4 answers2024-08-15

The floor of the living room is raised, but this will make the space look smaller, and the door may also be raised, so it is recommended to let him go high.