A few days after the floor tiles are laid, you can install the interior door

Updated on Inner door 2024-04-09
2 answers
  1. Anonymous users2024-01-23

    I am also in the process of renovating, and the renovation company suggested that it would be better for me to do other projects five or six days after the bricklaying was completed.

  2. Anonymous users2024-01-22

    Generally, the interior door can be installed after the floor tiles are left vacant for 3-7 days.

Related questions
1 answers2024-04-09

As long as it is done, you can take a bath when you clean it and have hot water.

1 answers2024-04-09

Problem analysis: Hello, this situation is considered to be caused by uterine contractions, pay attention to good nursing, it can recover on its own. >>>More

4 answers2024-04-09

The firmness of the tile is mainly determined by whether the material used for the paste is dry and solid, and the starting time of the cement mortar is 72 hours after the cement mortar is fully cured. Therefore, domestic hot water can be used 24 hours after the bathroom decoration is tiled.

1 answers2024-04-09

After circumcision, there is no need to go to the toilet with a paper pad, and the urethral opening will not soak the incision or gauze when urinating against the mineral water bottle. >>>More

1 answers2024-04-09

The defective part is removed and a new tile is re-installed. >>>More