What should I pay attention to when installing a bathroom?

Updated on Bathroom 2024-08-04
7 answers
  1. Anonymous users2024-01-24

    1. It is inconvenient to use any type of telephone in the bathtub and shower to avoid electric shock and fire hazards.

    2. It is inconvenient to lay wooden floors.

    3. It is inconvenient to hang underwear and wet bath towels in the bathroom, and should be exposed to the sun.

    4. It is inconvenient to store a lot of cosmetics.

    5. It is inconvenient to put a washing machine in the bathroom.

  2. Anonymous users2024-01-23

    In addition to waterproofing the ground, don't forget that the door should also be waterproof, and try not to install wooden doors.

  3. Anonymous users2024-01-22

    1.The waterproof base layer is dense, flat and dry.

    2.The waterproof height is correct and reasonable; For example, when bathing in the bathroom, water will splash on the adjacent wall, and if there is no waterproof treatment, the adjacent wall and the opposite corner wall are prone to dampness and mildew. Therefore, be sure to do a good job of waterproofing the ground before laying floor tiles.

    The waterproof treatment of the general wall specified in the acceptance measures for home decoration projects needs to reach the height of meters, and the cabinet next door to the inner wall should be meters high, but if it is a non-load-bearing light wall, the entire wall is best to be waterproof, at least to be meters high.

    3.The corners and other parts should be rounded.

    4.The floor tile paving should be done as much as possible with the wet paving process.

    5.Find the slope in strict accordance with the design requirements.

    6.It is forbidden to slotted pipes on the ground to destroy the original waterproof layer.

    7.Special attention should be paid to the flue, floor drain, riser and other peripherals to be carefully constructed.

    8.The waterproof paint should be painted many times, and each time it should be dried before the next one can be painted; Paint twice in a perpendicular direction to each other.

    9.After the waterproof coating is applied, pay attention to protect it from being damaged.

    10.The caulk should be dense and uniform, and it is strictly forbidden to leak the joint.

    11.Bathroom, kitchen wall and floor tiles are correct and reasonable; For example, the tile paving of the bathroom should be the wall tiles pressing the floor tiles, and then the wall tiles adjacent to the floor tiles should be paved after the floor tiles are laid.

    12.The ratio of cement mortar is reasonable, and it is mixed with waterproofing agent.

  4. Anonymous users2024-01-21

    Nothing else matters, the main thing is that the waterproof problem is a headache! When sweeping the waterproof material on the wall, it is best to sweep it above, and it is best to sweep the door fence as much as possible. It is best to do secondary drainage facilities.

  5. Anonymous users2024-01-20

    It is important to pay attention to the waterproofing treatment.

  6. Anonymous users2024-01-19

    Waterproofing is a big problem, if your bathroom waterproofing is not done well, seepage downstairs will cause any economic losses to be paid by you.

    The following 14 points must be achieved in the waterproof construction of the bathroom

    1.The waterproof base layer is dense, flat and dry.

    2.The waterproof height is correct and reasonable; For example, when bathing in the bathroom, water will splash on the adjacent wall, and if there is no waterproof treatment, the adjacent wall and the opposite corner wall are prone to dampness and mildew. Therefore, be sure to do a good job of waterproofing the ground before laying floor tiles.

    The waterproof treatment of the general wall specified in the acceptance measures for home decoration projects needs to reach the height of meters, and the cabinet next door to the inner wall should be meters high, but if it is a non-load-bearing light wall, the entire wall is best to be waterproof, at least to be meters high.

    3.The corners and other parts should be rounded.

    4.The floor tile paving should be done as much as possible with the wet paving process.

    5.Find the slope in strict accordance with the design requirements.

    6.It is forbidden to slotted pipes on the ground to destroy the original waterproof layer.

    7.Special attention should be paid to the flue, floor drain, riser and other peripherals to be carefully constructed.

    8.The waterproof paint should be painted many times, and each time it should be dried before the next one can be painted; Paint twice in a perpendicular direction to each other.

    9.After the waterproof coating is applied, pay attention to protect it from being damaged.

    10.The caulk should be dense and uniform, and it is strictly forbidden to leak the joint.

    11.Bathroom, kitchen wall and floor tiles are correct and reasonable; For example, the tile paving of the bathroom should be the wall tiles pressing the floor tiles, and then the wall tiles adjacent to the floor tiles should be paved after the floor tiles are laid.

    12.The ratio of cement mortar is reasonable, and it is mixed with waterproofing agent.

    13.Do a good job of pressure test, water splashing, and closed water test.

    14.Mark the pipeline direction in time and draw a pipeline direction diagram.

  7. Anonymous users2024-01-18

    Ground: Pay attention to waterproof and non-slip. The floor decoration material of the bathroom is best to use non-slip floor tiles with raised patterns, which not only have good waterproof performance, but also will not be too slippery even in the case of water.

    Top: moisture-proof and sheltering are the most important. When decorating the top of the bathroom, you should pay attention to prevent water vapor, so it is best to use PVC gusset with good waterproof performance. This gusset can be mounted on the keel and can also be used to cover the pipe.

    Circuit: Safety first. Bathrooms are damp, so be careful when installing lights and wires. Lamps and switches are best equipped with safety features. Joints and latches must also not be exposed.

    Lighting: Bright is enough. Bathrooms generally use waterproof solar wall lamps or explosion-proof incandescent chandeliers. In terms of lighting, it is better to be slightly stronger to compensate for the lack of natural lighting.

    Greenery: Add life. The bathroom should not be a forgotten corner of greenery. You can choose some shade-tolerant, moisture-loving potted plants to place in the bathroom to make it a little more lively and a little cooler.

    After the completion of the hydropower project, the installation of the squatting toilet should be completed (the squatting toilet tank can be installed after the wall tiles are attached). Do waterproof treatment first, brush waterproof mortar. After drying, fill the house with water a few centimeters high, check for leakage after 24 hours, and drain the water if not.

    Now you can put wall and floor tiles. After the bricks are pasted, you can suspend the ceiling, and at the same time reserve the holes for electrical appliances such as bath bombs and ventilation fans.

    The above is basically completed kitchen decoration. Finally, the custom-made kitchen cabinets are shipped for installation, the installed sanitary ware has been ordered, and finally the electrical appliances (such as lights, bath bombs, etc.) are installed.

    You can take a look on the website of Jiadao Haida Decoration, there is a decoration knowledge section in it, you can take a look.

Related questions
9 answers2024-08-04

1. Bathroom wall waterproofing Bathroom waterproofing is one of the most important issues, and we must pay attention to it when designing home decoration. If the white walls are disfigured by the seeping water, it is not only an economic loss, but also affects the quality of life. So how is the bathroom waterproof? >>>More

2 answers2024-08-04

A key point is to add wall handrails around the perimeter of the wall for the elderly (as in the hospital hallway). Slip prevention! While using non-slip bricks for floor tiles, it is best to lay waterproof and non-slip plastic floor mats, which can have some cushioning effect when falling.

1 answers2024-08-04

1. The color should not be too mixed, so as not to "add chaos". >>>More

1 answers2024-08-04

The installation of the toilet can not be completed by itself, the installation of the toilet bowl needs to go through various calculations and measurements, generally before installation, you need to let the master first conduct a comprehensive inspection of the sewage pipe, to see if there is debris blockage inside the pipe, and at the same time check whether the ground around the toilet installation location is horizontal, if you find that the ground levelness is tilted, you need to level the ground before the safety toilet.

3 answers2024-08-04

Generally, the hotel and toilet are mainly guest rooms, which directly reflect the grade and details of the hotel.