What time is the waterproof effect of the kitchen

Updated on Kitchen 2024-08-20
1 answers
  1. Anonymous users2024-01-24

    When the waterproof layer is dry, you can do a closed water experiment.

    Closed water test steps:

    1. After the waterproof construction is completed, the closed water test can be done after the waterproof layer is dry;

    2. Temporarily block the floor drain and the perimeter of the pipeline mouth;

    3. Build a 20 cm high retaining wall at the door;

    4. Start to store water, with a depth of 5-20 cm, and mark the water level;

    5. Water storage time 48 72 hours;

    6. After the water is closed on the first day, see if the water level has dropped significantly, if so, please check whether there is leakage around the roof and pipes downstairs in time, if not, continue to close the water;

    7. On the third day, the water is closed, and the downstairs ceiling and roof pipes are fully inspected.

    8. Carry out the next process after being fully qualified.

Related questions
2 answers2024-08-20

In fact, it doesn't take long for the kitchen to be renovated, if you need to customize the whole cabinet, it will take a little longer, but you can let them design the cabinet first, and you can dismantle and install it directly after it is done, of course, if you also need to re-make the floor tiles, it depends on the weather, after all, you have to wait until it is dry to use it, right, if you ask when the transformation is better, I personally tend to do it in summer, because of the weather, easy to dry, this is a pointSecond, because everyone feels hot in summer, it is an off-season for these companies, so the price is cheaper. Of course, this is just my personal opinion, as for whether this is the case, I still need to visit to know. Here in Changsha, Jia Zhihe is doing this. >>>More

3 answers2024-08-20

There is a construction project quality acceptance specification, which is a part of the waterproof layer, and I personally feel that it cannot be regarded as a separate sub-project. When I made the information, I put it in it when I applied for the inspection of the waterproof layer, the front is the inspection batch of the waterproof layer, the back is it, and then add a construction inspection record, basically on the line! However, the requirements of each place are different, so ask the supervisor for his opinion! >>>More

1 answers2024-08-20

When the snake people will change the kitchen, then I'm not sure.

1 answers2024-08-20

It's usually on the first or fifteenth day of junior high school, in fact, the clear oil lamp in the kitchen, he still has a relatively simple feeling, and it is a situation with a strong sense of ritual, I think you just follow your rules or customs to order.

3 answers2024-08-20

Hello, different areas have different best times for construction. By the Bang Mei sewing experts tell you: in general,Living room, balcony, bedroom After the completion of the dust-prone processes such as wall tile painting latex paint or wallpaper, clean and then make tile seams. >>>More