You need about 8 square meters of sand and 2 tons of cement, depending on the depth of the ground in your rough house.
-
3 cubic meters of sand, 2 and a half tons of cement.
Where are you located? I can take a look at the cement It takes 2-6 bales, and the amount of cement varies according to the needs of the owner.
1. The yin corners around the bathroom do not need to be made into arcs or obtuse angles, and there is no requirement or necessity in the specification; >>>More
Summary. Yes, if you are on the first floor of a bungalow, it will not have a big impact if the ground is not waterproofed. However, after a long time, the walls next to the bathroom will have water seepage. >>>More
The 107-square-meter house, paving floor tiles, kitchen and bathroom, and bricklayer cost about 3,000 yuan.
This is not a legal provision, it is a requirement of the building design code, to reserve the height of the tiles, but also to avoid the water in the bathroom or kitchen from flowing into the living room. Therefore, when decorating, you should also pay attention to finding slopes.