Daily home decoration, for the selection of water based waterproof coatings in the waterproof constr

Updated on Bathroom 2024-08-26
1 answers
  1. Anonymous users2024-01-24

    Waterproofing is now better on the market, there are Degao, Henkel, Sika, Baide, these can be the process is generally about 30 cm from the ground, and the bathing position is at least meters.

Related questions
2 answers2024-08-26

1. Bathroom waterproof construction steps.

Step 1: You can use slightly coarser cement as a primer first, and wait for the cement to dry before brushing the waterproof coating. But in painting money, the ground should be flat and there should be no grooves. Water is then sprinkled on the ground to expel the gas from the small holes. >>>More

1 answers2024-08-26

Depending on the type of waterproofing material you use, the standard is that the waterproofing layer is dry.

10 answers2024-08-26

In different places, different materials should be selected, and it is recommended to choose the comabic sensitivity of the membrane for the ground, and the rigid one for the wall. >>>More

2 answers2024-08-26

The bathroom sinks without a foot and the sanitary threshold is one foot lower, waterproof must be dry at least full brush twice, waterproof and dry after the water is checked in the bathroom for 48 hours and 72 hours, the sewage pipe is not - a pipe, he will not be full of brush (1 meter 2 to 1,5 meters) to buy a commercial house, don't be afraid not to close the trouble waterproof can not directly paste tiles, Wei Xianjian I said that I have to brush twice, on the sand dry can be tiled. Waterproof must be fully brushed, do not stick tiles on the anti-top.

3 answers2024-08-26

The post-inspection work is also important:

Clause. 1. The ground must be cleaned when applying the waterproof coating, otherwise the adhesion is not good and it is easy to leave the layer; >>>More