The masters who understand the waterproof and leakage repair technology of the roof bathroom came in

Updated on Bathroom 2024-08-09
5 answers
  1. Anonymous users2024-01-24

    Absolutely not, it won't take long to get an effect, construction.

    Scheme:1Raw material: Hefeng JE-I waterproof adhesive.

    2.within the construction steps.

    1. Mix the cement and sand evenly, and then add JE- and water.

    2. Press"JE- cement silt sand water = 1 6 13 appropriate amount of water (about 2)."Stir into a waterproof mortar, pay attention to the mixing to be even.

    4. Use qualified cement above general silicon, and the sand is medium and fine sand, and the mud content is less than 3%.

    5. The amount should not be too much at one time, and the stirred materials should be used up within 45 minutes. Stirring must be even.

    6. Proper maintenance after construction, closed water test can be carried out after 24 hours, and no leakage is qualified after 48 hours, and can be delivered.

    7. The amount in structural waterproof concrete is 5% of the weight of cement.

    8. The construction temperature is more than 5.

    1.Construction raw material: JE-polymer waterproofing mortar.

    2.Construction plan:

    1. Clean up the construction surface and sweep it with water until it is slightly wet.

    2. Mix the two components of the product and stir evenly for later use, do not add water.

    3. Use a "batch spoon" or "brush" to evenly coat the glue on the treated construction surface.

    4. More than two layers must be painted, and each construction interval should be done for the second time after the last dry (non-sticky), and the average thickness can reach 2mm.

  2. Anonymous users2024-01-23

    It's not practical, what can you use to stick if there is dust in the gaps?? Nowadays, toilets and toilets are generally waterproof made of polymers.

  3. Anonymous users2024-01-22

    There are many ways, waterproof, moisture-proof, your kind is just leak-proof, this is very professional, not very clear.

  4. Anonymous users2024-01-21

    It can be adopted because it helps others to be happy.

  5. Anonymous users2024-01-20

    I know the waterproofing technology of the roof toilet and have been practicing it for many years.

Related questions
2 answers2024-08-09

It depends on whether the leakage is big, if it is not big, you can use AB glue, if you want to think better, it is best to replace the iron pipe with a plastic pipe, or PPR pipe

1 answers2024-08-09

Bathroom is a place where you have to be in close contact with water every day, and the bathroom waterproof must be in place, if the bathroom practice is not standardized, the leaky water will not only cause losses to your own home, but also may cause damage to the downstairs neighbor's house, and cause unnecessary trouble. >>>More

1 answers2024-08-09

First of all, it needs to be explained that waterproof material and leak plugging material are two different concepts, simply put, waterproof material is used to do waterproofing before leakage, the purpose is to avoid leakage, and it is carried out before the leakage occurs. Common waterproof materials in the bathroom include kitchen and bathroom waterproof slurry, K11 waterproof slurry, mortar waterproofing agent, etc. >>>More

6 answers2024-08-09

Bathroom waterproof leakage repair method: If it is caused by the leakage of the waterproof layer, then the original tile needs to be removed and the base surface cleaned. After the cement mortar is proportioned, the ground is leveled and further waterproofed. >>>More

1 answers2024-08-09

Is there already tiling in the bathroom now, and now I just want to fill the leak? >>>More