The home decoration balcony has been painted with orange exterior wall latex paint, and now the balc

Updated on Balcony 2024-08-12
4 answers
  1. Anonymous users2024-01-24

    This will be more troublesome, if your exterior wall paint is better, and now the adhesion is more solid, then first sandpaper sanding, and then scraping putty, and then brushing the interior wall paint, otherwise it will really not cover the base color.

  2. Anonymous users2024-01-23

    Because the background color is too bright, the interior wall paint is light color, which must not be covered, or after scraping the layer of putty, it is better to brush the interior wall paint.

  3. Anonymous users2024-01-22

    Definitely not, it can't cover the red color, and you have to rehang the ash.

  4. Anonymous users2024-01-21

    It is recommended to use the same interior wall paint as the living room, which will be more harmonious, and I hope it will inspire you.

Related questions
3 answers2024-08-12

If you want to make the effect of wood, you can go to find the mortar powder of imitation wood, just brush it directly on it, if you have to install the kind of wood you said, then you can only make a layer of keel on your balcony, and then put the wood you want to get on the keel to fix, don't go to smash the waterproofing of the floor, otherwise it will be too troublesome to leak.

1 answers2024-08-12

It is better not to do so as not to cause damage. If you really want to pass, put cardboard on it. Good luck!

2 answers2024-08-12

The leakage of the balcony roof can be solved by paving the SYR reactive adhesive polymer waterproof membrane, and the national standard material is of good quality.

5 answers2024-08-12

First, it is better to determine whether there is a floor drain on your balcony and place the washing machine close to the floor drain, second, try to avoid the washing machine from being exposed to the sun, and third, it is best to do waterproof treatment on the balcony where the washing machine is placed... Hope it works for you.

2 answers2024-08-12

If the leakage location downstairs is around the pipeline, you can remove the floor drain around the perimeter and redo the waterproof construction, if the water leakage in other parts downstairs is recommended to remove the floor tiles on the balcony upstairs, and redo the waterproof layer construction, and the waterproof is done after the closed water experiment for 72 hours without leakage in the next step of construction.