-
If the leakage location downstairs is around the pipeline, you can remove the floor drain around the perimeter and redo the waterproof construction, if the water leakage in other parts downstairs is recommended to remove the floor tiles on the balcony upstairs, and redo the waterproof layer construction, and the waterproof is done after the closed water experiment for 72 hours without leakage in the next step of construction.
-
If the waterproof layer is not done, it is recommended to warp the floor tiles, make waterproofing from scratch, and do a good job of drainage.
The point is that the waterproofing layer is not done well! You definitely only made a simple waterproof! The waterproof layer is to do a good job of the edges together! >>>More
The shoe cabinet is cleaned up and greenery is placed next to it.
What is the floor made of, it is best to use a non-slip material.
You don't need to spread anything, or you can spread some leaves, so that you don't have to water so quickly.
It is nothing more than a water bar, and some areas are used to shabu cloth on the balcony.