What are the precautions for the installation of toilet sewer pipes?

Updated on Bathroom 2024-08-16
4 answers
  1. Anonymous users2024-01-24

    1. Be sure to plan well, planning in decoration is a waste of time, energy, manpower and material resources. Plan ahead such as the location of the sink, the location of the toilet, the location of the floor drain, the location of the bathtub, the location of the bathtub, the location of the lights, the location of the switch socket, etc. And the location and size of each place must be planned.

    Planning a renovation won't have too many problems and hassles.

    2. Pay attention to moisture and cover on top. The water in the bathroom is relatively large. Currently, the general house is a bathroom and the bathroom is integrated.

    As a result, bathrooms are often surrounded by water vapor, so moisture on top is important. Make a moisture cover on top of the bathroom. For example, coat the top with a layer of water glass.

    Then use a PVC gusset with better waterproof properties.

    3. Sanitary ware is reasonable and suitable, and the first thing to consider when choosing sanitary ware is the size and shape of the bathroom. You can't blindly choose the sanitaryware you have to look at instead of applying. The main sanitary ware includes: basins, toilets, bathtubs, showers and shower mixers.

    4. Pay attention to lighting and ventilation, and the lighting and ventilation of the bathroom are also very important. The ideal method of natural ventilation is to choose the type of window and opening method that is shaded and less ventilated to ensure that the ventilation area is not less than 1 20 of the bathroom's floor area.

  2. Anonymous users2024-01-23

    Bathroom drainage is an important part of bathroom decoration, and we use a lot of water every day to flush the toilet and take a bath. Therefore, the quality and scientificity of bathroom drain installation must be high. Otherwise, it will bring a lot of trouble to our lives.

    So, what are the precautions and installation tips when installing bathroom drains?

    How to install a bathroom drain?

    1. The hot and cold water pipes in the bathroom should be separated, and the distance should not be too close, and the height of the shower water pipe should be between meters and meters.

    2. When the bathroom water pipe is installed, the general water pipe goes to the top and does not go to the ground, the cold and hot water outlets must be horizontal, generally hot on the left and cool on the right, the pipeline is laid horizontally and straightly, and the layout direction should be safe and reasonable. The position of the pipe clamp and the slope of the pipe should meet the requirements of the specification. All kinds of valves should also be installed in the correct and flat position, which is easy to use and maintain.

    3. The cold and hot water pipes are all into the wall, and the depth of the tank needs to be checked when slotting, and the cold and hot water pipes cannot be the same tank.

    4. When installing the water heater inlet and outlet, the water inlet valve and the air inlet valve must be considered and installed in the corresponding position.

    What are the precautions for bathroom drains?

    1. The correct sequence of bathroom water pipe installation.

    Be sure to follow certain reasonable steps before installing the water pipes in the bathroom. First of all, it is necessary to discuss the specific direction of the waterway with the installation master, the second step is to fix the clip to the wall with an electric hammer, the third step is to start the hot melt connection of the pipe with a professional hot melt machine, the fourth step is to use the pressure test pump to test the entire pipeline, and the fifth step is to clean up the site.

    2. The design and layout of toilet water pipes.

    The installation of toilet water pipes should be laid according to the direction of the water, generally horizontal and vertical, as far as possible 2 pipes do not cross, if the cross to build a bridge, the hot and cold water pipes are separated and kept at a certain distance, the left and right positions of the bathing water mixing valve are correct and installed in the middle of the bathtub, the height is best between meters and meters, and the installation of water heaters and the inlet and outlet of the washing machine should be reserved for the position, so as to achieve a scientific and reasonable layout.

  3. Anonymous users2024-01-22

    According to the needs of the owner's family life; design and installation of the necessary facilities; The design and installation must be reasonable and the positioning must be accurate; It is easy to use, the water is smooth, and special attention is paid to not leaking.

  4. Anonymous users2024-01-21

    What problems should be paid attention to when installing the toilet sewer pipe?

Related questions
3 answers2024-08-16

The water is not pressurized, and the waterproof pipe joints can be glued for a long time. >>>More

4 answers2024-08-16

Bathroom drainage is an important part of bathroom decoration, and we use a lot of water every day to flush the toilet and take a bath. Therefore, the quality and scientificity of bathroom drain installation must be high. Otherwise, it will bring a lot of trouble to our lives. >>>More

1 answers2024-08-16

The length is not long, but it can not be directly connected to the manure tank, and then the pipeline should be done before entering the manure tank, and then it is advisable to enter the manure tank from the well, so that it is convenient for future maintenance and repair.

2 answers2024-08-16

One: the indoor pipe must be deodorized, and the second is that the pipe must be sloped.

3 answers2024-08-16

The toilet reserves the distance between the sewer and the wall, and the toilet selection tool can be 30 cm to 40 cm according to the room type of the toilet and personal preferences, which is relatively normal, and the strong one who can reserve 20 cm in actual operation, and the actual distance from the center line of the sewer, the actual distance of the bridge deck can be 32 cm to 42 cm, and there will actually be an error of 10 cm, which is very normal.