Is it troublesome to renovate the bathroom?

Updated on Bathroom 2024-08-16
5 answers
  1. Anonymous users2024-01-24

    1. The bulb type can be said to be our common bath bomb, and most friends also have this type of bath bomb installed in their homes. Everyone knows that the sealing of this bath bomb is not very tight, and the bathroom is always in a humid state, this kind of bath bomb works in a humid environment, and there will inevitably be great safety hazards. The lamp warm bath bomb can generate heat mainly by its light to heat, and the lights to be heated are generally relatively strong, so the lights are generally more dazzling.

    2. After all, the bath bomb is still an electrical appliance, and when the air is relatively humid for a long time, our bath bomb is very prone to short circuit. Especially if you are greedy for a small bargain and buy a cheap bath bomb, it is even more likely to have problems. The general power of bath bombs is still relatively large, and once something happens, it will be very dangerous.

    We turn on bath bombs in winter, which is also a waste of electricity, after all, we take a bath for such a long time.

    3. In addition, in recent years, many businesses, driven by interests, will use the trick of fishing in troubled waters to cut corners when manufacturing bath bombs, or directly use inferior materials. I believe that because of the accident of the bulb-type bath bomb, friends have seen no less than a few!

  2. Anonymous users2024-01-23

    1. Be sure to plan well, planning in decoration is a waste of time, energy, manpower and material resources. Plan ahead such as the location of the sink, the location of the toilet, the location of the floor drain, the location of the bathtub, the location of the bathtub, the location of the lights, the location of the switch socket, etc. And the location and size of each place must be planned.

    Planning a renovation won't have too many problems and hassles.

    2. Pay attention to moisture and cover on top. The water in the bathroom is relatively large. Currently, the general house is a bathroom and the bathroom is integrated.

    As a result, bathrooms are often surrounded by water vapor, so moisture on top is important. Make a moisture cover on top of the bathroom. For example, coat the top with a layer of water glass.

    Then use a PVC gusset with better waterproof properties.

    3. Sanitary ware is reasonable and suitable, and the first thing to consider when choosing sanitary ware is the size and shape of the bathroom. You can't blindly choose the sanitaryware you have to look at instead of applying. The main sanitary ware includes: basins, toilets, bathtubs, showers and shower mixers.

    4. Pay attention to lighting and ventilation, and the lighting and ventilation of the bathroom are also very important. The ideal method of natural ventilation is to choose the type of window and opening method that is shaded and less ventilated to ensure that the ventilation area is not less than 1 20 of the bathroom's floor area.

  3. Anonymous users2024-01-22

    It is very troublesome to redecorate the bathroom, remove all the facilities of the bathroom, the key is to smash the wall (brick), not only to smash the bricks, but also not to destroy the strength of the wall, you should be very careful, when smashing the floor tiles, you must not destroy the geothermal heat, can not destroy the outlet of the sewer pipe. After cleaning up the site, redo the wiring of plumbing and electricity, go to the cassette, etc., and then do waterproofing, and before sticking the bricks, the geothermal heat must be re-pressed. That's all you can think of, and you can grasp it yourself.

  4. Anonymous users2024-01-21

    1. Because it is a secondary decoration, so before the decoration, the first thing you need is to knock off the floor tiles before you can use the floor tiles you have purchased to pave the floor. It is also important to note that it is necessary to avoid broken tiles entering the sewer, otherwise it will be congested, which is a big problem that is difficult to solve.

    2. The floor tiles are knocked off, the wall tiles also need to be replaced, and professional tools are needed to break the wall tiles, professionals to carry out the project, and if the operation is not done properly, it will have a certain impact on the wall, which involves the safety of the building, and must be paid attention to. In terms of second-hand housing renovation and partial transformation, the famous craftsman has professional construction labor, as well as supervision and supervision of the entire construction period, so that the decoration is no longer troublesome.

    3. When you want to renovate and design the bathroom, you should carefully and comprehensively consider some problems that will be encountered, so that when you reinstall, the process will be relatively smooth, and the construction period will be relatively fast, otherwise there is no plan to proceed, and it is very likely that after the second decoration, it is not the ideal result you want.

  5. Anonymous users2024-01-20

    Say it's troublesome, it's troublesome, and don't bother! It's not a hassle either! It's up to you!

    Here's how to renovate it! Make a reference!

    1. Design, must be designed, design is the basis for your later use!

    2 Demolish, dismantle the original thing, and return to the state of the foundation blank!

    3. Hydropower transformation, according to the design of hydropower to the end!

    4. Redo waterproofing, waterproofing is indispensable, and the project must be in place!

    5. Re-tiling, of course, this can't be missing!

    6. Re-ceiling, the ceiling is simple, 300*300 aluminum buckle plate is directly installed!

    7Install the sanitary ware! It's nothing after installing the sanitary ware!!

Related questions
3 answers2024-08-16

It needs to be redone, because in the process of reinstalling the bathroom, the worker master will not guarantee that it will not destroy the waterproof layer that was done before, if you are on the first floor, you don't have to do it again, if it is not the first floor, it is recommended to redo it, because once the water leaks and has to be renovated, the loss caused is not a little bit, and the current waterproof is not too expensive.

3 answers2024-08-16

You don't have to change it, you just switch the shower position and the washbasin position, and both positions are drainage. But when redecorating, pay attention to protection, don't let the sediment clog it.

3 answers2024-08-16

Yes, some decoration companies can do partial decoration, but to talk about how to change water and electricity, this is a troublesome matter, add money is also here, talk about a few, do more comparison, and then there is waterproofing It is best to let the decoration company do it higher, it is necessary for the exterior wall.

1 answers2024-08-16

Knock off the tiles, ask someone to pick up the garbage, load the car to throw more than 500, the tile spring with the shop + moving fee 1500 + mason salary 1000, waterproof material 300, >>>More

6 answers2024-08-16

This depends on whether your bathroom structure is responsible for arguing cavity, the degree of difficulty of construction to dig and decide, under normal circumstances, the size of the ordinary bathroom area is judged to star, even dismantling to install it in about 3-4 days, the key is that the waterproof can not be constructed immediately.