After the bathroom floor is waterproofed, the ground is about 2 cm higher than the ground outside

Updated on Bathroom 2024-08-11
1 answers
  1. Anonymous users2024-01-24

    It's nothing, don't pursue the bathroom floor as high as the outside, it's meaningless, it's not a level, it's not the same thing, there's no need to pursue a level.

Related questions
6 answers2024-08-11

1. All are separated by L-shaped passage stones, which is a common situation. >>>More

2 answers2024-08-11

In the process of paving, it should be installed directly, not on the contact pipe head below the floor drain - to ensure the appearance.

3 answers2024-08-11

1. First of all, the foundation should be laid, and the wall must be waterproofed, and the wall should be waterproofed before the wall tiles are laid. In the general waterproof treatment, the wall should be waterproofed with a height of 30 cm, but for the non-load-bearing light wall, the entire wall should be waterproofed, at least 60 cm high. If you need to replace the original floor tiles in the bathroom, after chiseling off the original floor tiles, you must first level the ground with cement mortar, and then do waterproof treatment, so as to avoid leakage caused by uneven thickness of waterproof coating. >>>More

3 answers2024-08-11

Depending on what kind of material, generally 24-48 hours after the water test, the construction can be carried out after the water test.

5 answers2024-08-11

Do waterproofing needs to be done on the surface of the water, dig excellent permeability crystalline waterproofing, you can do it yourself on the cement surface with a super permeable waterproof guard (if there are cracks and potholes on the cement surface, fill the complete with metin porcelain glue and then do waterproofing). >>>More