Is the waterproofing of the bathroom first covered with mud and sand to cover the water pipes and th

Updated on Bathroom 2024-08-17
1 answers
  1. Anonymous users2024-01-24

    Brush the waterproof coating first, bathroom waterproof and other places waterproof is not the same, you need not only to prevent open water but also to prevent dark water, mildew, anti-fouling and other functions, the thickness of the waterproof layer may not meet the requirements of the mortar first, waterproof ability and life will be discounted for a long time, so you must first do a good job of waterproof layer in the surface decoration, bathroom waterproof you can take a look at Repham multi-functional waterproof coating, use a variety of environments, waterproof performance and life are very good.

Related questions
3 answers2024-08-17

The waterway pipeline should be done first, and then waterproofing, the reason is that the drainage pipe needs to be slotted and drilled, which will destroy the waterproof layer, so the waterway pipeline must be done first, and then waterproofing.

3 answers2024-08-17

Take the water pipe first and then do waterproofing to ensure that the water pipe is not well connected and will not leak.

8 answers2024-08-17

Summary. What to pay attention to when waterproofing the bathroom. >>>More

1 answers2024-08-17

No, just make sure the new pipes don't leak.

2 answers2024-08-17

It is normal to paste wall tiles first, and then floor tiles is better.