-
What are you looking for?
Don't make it clear!
-
Just look for workers, go to the labor market and look for it.
If you want to find it, go to 58.com, which has a lot of various job postings posted locally. >>>More
I am not a project supervisor, and the person who inspected the work is called a project supervisor. >>>More
The construction of the waterproof screed should be carried out after the construction of the screed. The drainage slope of the ground to the floor drain is 2%; The edge of the floor drain is 50mm outward, and the drainage slope is 5%; The ground of a large area of public toilets and baths should be partitioned, and a floor drain should be set up in each district, and the drainage slope in the area should be 2%, and the straight length of the slope should not be more than 3m; The floor of the foyer of the public toilet can be unsloped.
1. Aluminum-plastic panel ceiling: The aluminum-plastic panel ceiling is a composite material processed by chemically treated coated aluminum plate as the surface material, polyethylene plastic as the core material, and processed on special aluminum-plastic panel production equipment. Compared with the economy, but after a long time, it is simple to deform, waterproof and fireproof is not strong, and it is simple to get wet in the cleaning room. >>>More
Usually such a resident is a poor scoundrel, you can negotiate with him to pay for his own money to help him re-lay the bricks, unless his house is asking for a sky-high price, if this is the only way to go through the judicial process. >>>More