My house has just been renovated, but the bathroom has been repaired several times, please ask what

Updated on Bathroom 2024-08-27
1 answers
  1. Anonymous users2024-01-24

    Bathroom water seepage should be waterproof is not done, to do waterproof! The precautions are as follows:

    1. Do the leveling layer. First of all, the ground should be leveled with cement mortar (especially for rerenovated houses), and then waterproofing. This avoids leakage caused by uneven thickness or puncture of the waterproofing membrane.

    2. Do a good job in key parts. The joints between the wall and the floor, as well as the joints between the water and sewer pipes and the ground, are the most problematic areas. Therefore, these parts must be paid special attention to, and the treatment must be meticulous, without the slightest sloppiness.

    3. The wall should also be waterproof. In order to achieve a better waterproof effect, the wall of the general bathroom should also be waterproofed about 30cm high to prevent water from penetrating the wall. The wall adjacent to the bathtub should also be waterproof at a height higher than the upper edge of the bathtub, and the shower should reach a height of 180 cm.

    4. Do a waterproof test. After the waterproofing construction is completed, all the sewers of the toilet should be blocked and the water injection test should be carried out. After 24 hours, if there is no leakage on the walls and floors around the bathroom, it means that the waterproof quality of the bathroom is very good.

    On the contrary, it is necessary to find out the leakage point and carry out repairs.

Related questions
3 answers2024-08-27

Smashing the wall and opening the window seems to be unnecessary to make such a big project, which is economical and effective is to make a hole in the wall and install a ventilation fan, which has the same function as the window, and will not destroy the original design of the bathroom, isn't it very good?

5 answers2024-08-27

This was originally wiped clean by the masters while doing it, and they had to fill the joints after they were done, or they would dry it out and then do the beautiful seams, if these processes were done and there was still residual cement, use a scraper or shovel to get rid of it, but you have to pay attention not to get rid of the floor tiles, and there is also a kind of soaking with industrial sulfuric acid for half an hour, and then using a plastic shovel to remove it, and then rinsing it with clean water, that is, this method smells too big when soaking and rushes the nose, some people can't stand it, it depends on how you choose!

2 answers2024-08-27

It should still be in the warranty period, find the construction unit, rework, trivial things, don't worry, check other projects well, if there are unqualified, do a good job.

3 answers2024-08-27

First of all, the wall outside the bathroom is damp, peeling and other phenomena, most of which are caused by water leakage, and now you need to find the cause of the water leakage first >>>More

1 answers2024-08-27

The squatting pit is not equipped with a water trap.

Or buy a re-install one with a trap, but the pit will be higher than the ground. >>>More