The bathroom is waterproof and leaking, which five steps are indispensable in the construction, and

Updated on Bathroom 2024-08-08
9 answers
  1. Anonymous users2024-01-24

    The bathroom is one of the most used places in our daily life, we bathe and wash here, so the bathroom will always give us a damp feeling Therefore, it is necessary to pay attention to the waterproofing of the bathroom during the decoration process.

    Because if a waterproof leak is not done, it will affect your own life, and the second will affect the people who live downstairs in your own house, that is, it will not only bring trouble to your own life but also to the life of others. Such an important thing, so what are the five things that you must pay attention to when you are decorating the bathroom?

    First, the clean-up work at the grassroots level. There are too many things that need to be dealt with in the house when decorating, and the general waterproofing is carried out after the water and electricity are changed, and when the water and electricity are changed, the ground and wall will inevitably leave some traces that need to be treated Then the first step of waterproofing work is the treatment of the grassroots level, make up the places that need to be repaired, and clean up the places that need to be cleaned up.

    Second, the screed layer work. Then when the first job is done, it is necessary to start the leveling work, the ground is uneven when the house is in the rough room, but the ground must be flat when we use it , so it is necessary to carry out screed work on the ground before other work can begin.

    Third, paint the waterproof coating, after doing the above work, it is to choose the waterproof coating with a better effect, and then paint the ground and wall that need to be painted.

    Fourth, do a finishing work for the waterproof place after doing a good job of waterproofing. This work is a protection work to prevent the waterproofing from being damaged in the subsequent work.

    Fifth, a 24-hour closed water test must be done. This is the most critical work in the waterproofing work, because only after the 24-hour closed water test, if there is no problem, the waterproof work is basically in place.

  2. Anonymous users2024-01-23

    The bathroom is waterproof and leaking, and there are five steps in the construction that are indispensable.

  3. Anonymous users2024-01-22

    The bathroom is waterproof and leaking, pay attention to the waterproof coating during construction, choose a better waterproof coating, and then paint the ground and wall that need to be painted.

  4. Anonymous users2024-01-21

    Indoor waterproofing is mainly kitchen and bathroom waterproof construction, other main attention to moisture-proof treatment of kitchen and bathroom waterproof barrier: plugging repair material - waterproof material - leveling layer - tile adhesive layer - tile + grout to form 5 interlocks.

  5. Anonymous users2024-01-20

    When decorating the bathroom, you must do a good job of waterproofing, otherwise it is very troublesome to leak water after living in, and you must pay special attention to it when decorating.

  6. Anonymous users2024-01-19

    When making a waterproof design for your home, you must first clean up the sanitation of its base layer, and then deal with the dust and impurities on the cement surface.

  7. Anonymous users2024-01-18

    If the bathroom is waterproof and leaking, it must be that the previous waterproofing work has not been done well, and it is also a very troublesome thing to repair.

  8. Anonymous users2024-01-17

    It may be that the thickness of the coating is not grasped in the laying. It is also possible that there is not enough time between the first and second rounds.

  9. Anonymous users2024-01-16

    The laying of waterproof coating, when laying waterproof coating, it is necessary to pay attention to the uniform brushing, the thickness should be guaranteed in the above, the dead corner and the wall junction should pay special attention not to be missed, some families will lay two layers of waterproof coating in order to ensure the quality of waterproofing, but here it is necessary to pay attention to the time interval between the two constructions, and the second construction can only be carried out after the first layer of waterproof coating is completely dry, otherwise it will affect the waterproof effect.

    Laying a protective layer, after a week of closed water test, at this time the waterproof coating has formed a waterproof membrane, we will lay a layer of cement mortar on top of the waterproof coating as a protective layer, this layer can not only protect the waterproof coating, but also facilitate the tiles in the future. After the protective layer is laid, a closed water test is carried out as a final check.

Related questions
1 answers2024-08-08

Change the master and change the brand of waterproof material, because I have never seen that master leak like this. If it is an old building, it is a hollow slab, and it is best to use asphalt for waterproofing.

8 answers2024-08-08

Maybe there is a leak in LZ's own waterway, or the top layer of waterproofing is not up to standard. You can ask the master to check whether the sewer pipe is not tightly closed, focusing on the water pipe of the basin and toilet, and the workers may damage these two places if they do not pay attention during the decoration. >>>More

6 answers2024-08-08

It's best to deal with it, and you can take a look at the waterproof construction specifications yourself.

1 answers2024-08-08

You can refer to these ideas!

Toilet waterproofing practices: >>>More

2 answers2024-08-08

This is indeed caused by leakage and blistering of the wallpaper, and the wall is moldy. I hope my answer can help you.