The plumbing and geothermal heat made the construction workers leak, and it was in the master bedroo

Updated on Master bedroom 2024-08-16
3 answers
  1. Anonymous users2024-01-24

    Connect the tube, if the conditions are possible, it is recommended to change to a complete tube, after all, it is equipment that will be used for decades, and you must pay attention to safety.

  2. Anonymous users2024-01-23

    It can only be dug up and connected with a hot melt connection of the pipe head, and the heating has an impact, but it is not very large.

  3. Anonymous users2024-01-22

    Buy a geothermal connector and connect it

Related questions
2 answers2024-08-16

Electric tremor spiral steel bar, tremor while moving forward.

2 answers2024-08-16

The installation of aluminum plate and aluminum-plastic panel is the same, but the aluminum plate is processed and formed to the construction site, and the aluminum-plastic panel is processed and formed after arriving at the construction site, and the website of the aluminum-plastic panel manufacturer is generally available.

2 answers2024-08-16

The toilet cleaner sold in the supermarket, the main ingredient is oxalic acid, which is very easy to use, so you might as well try it.

1 answers2024-08-16

There must be a responsibility. All have a warranty. Since there is an installation project (decoration), there must be a warranty responsibility. >>>More

3 answers2024-08-16

If it is welded, there is no problem. If you are ready to reconnect later, it is recommended not to bury it and put an ornament to cover it up.