What are the process steps and precautions for bathroom decoration

Updated on Bathroom 2024-08-16
5 answers
  1. Anonymous users2024-01-24

    What are the steps of the waterproofing process in the bathroom.

    1. Grassroots treatment.

    First of all, we must carry out ground treatment to ensure that the ground is clean, there is no debris pollution, the surface of the base is solid, there is no peeling and other phenomena, we also need to carry out ground leveling to ensure that the ground is flat, and there are no large defects and traces.

    2. Brush waterproof coating.

    Before we paint the paint, we should ensure that the bathroom is clean and dry. The waterproof coating should be fully brushed and firmly combined with the base layer, so that there will be no bubbles, falling off and other problems. When we paint, we should paint from the bottom up, first the wall and then the ground.

    Generally speaking, the waterproofing of the bathroom should be 180 cm, and the waterproofing of the non-shower wall should not be less than 35 cm. It is recommended that the waterproof uniform should be 180 cm. Brush paint not only pay attention to the height, but also pay attention to the thickness of the brush, the state stipulates that the waterproof paint should be coated to a millimeter thickness.

    The waterproof paint is brushed twice, and the second coat is to wait for the first coat to dry before you can start brushing.

    3. Lay a protective layer.

    We also need to lay another layer of protective layer on the waterproof layer, and the protective layer should be completely covered with the waterproof layer, and it should be firmly combined with it, and there can be no cracks, bubbles, falling off and other problems.

    4. Closed water test.

    Before doing the closed water test, all the sewer in the bathroom should be blocked, and a simple 25 cm high threshold should be made at the door of the bathroom, the bathroom should be sealed, and then 20 cm high water should be poured into the bathroom. After 24 hours, the water in the bathroom does not leak, and the toilet waterproofing project can be considered qualified.

    Precautions for bathroom decoration.

    1. Pipeline.

    Bathroom pipe installation, not only consider the hot and cold pipes of the water heater, but also consider the washing machine and other electrical appliances water problems, in the bathroom, you can also pre-install a faucet, used to clean the bathroom.

    2. Circuit.

    The socket in the bathroom can be reserved more, in order to prevent the electrical socket from being insufficient, resulting in the need to use a power strip, and the use of socket in the bathroom is easy to cause leakage and other problems. The bathroom should do a good job of anti-leakage protection mechanism, and it is best to install protective covers for sockets.

    3. Tiles.

    If the bathroom is small, it is better to choose light-colored tiles. Light-colored tiles can enhance the brightness of the bathroom. It is best to choose non-slip tiles for bathroom tiles to prevent water accumulation on the ground, causing the ground to be too slippery.

  2. Anonymous users2024-01-23

    1. Be sure to plan well, planning in decoration is a waste of time, energy, manpower and material resources. Plan ahead such as the location of the sink, the location of the toilet, the location of the floor drain, the location of the bathtub, the location of the bathtub, the location of the lights, the location of the switch socket, etc. And the location and size of each place must be planned.

    Planning a renovation won't have too many problems and hassles.

    2. Pay attention to moisture and cover on top. The water in the bathroom is relatively large. Currently, the general house is a bathroom and the bathroom is integrated.

    As a result, bathrooms are often surrounded by water vapor, so moisture on top is important. Make a moisture cover on top of the bathroom. For example, coat the top with a layer of water glass.

    Then use a PVC gusset with better waterproof properties.

    3. Sanitary ware is reasonable and suitable, and the first thing to consider when choosing sanitary ware is the size and shape of the bathroom. You can't blindly choose the sanitaryware you have to look at instead of applying. The main sanitary ware includes: basins, toilets, bathtubs, showers and shower mixers.

    4. Pay attention to lighting and ventilation, and the lighting and ventilation of the bathroom are also very important. The ideal method of natural ventilation is to choose the type of window and opening method that is shaded and less ventilated to ensure that the ventilation area is not less than 1 20 of the bathroom's floor area.

  3. Anonymous users2024-01-22

    First, the decoration steps.

    1. Design. 2. Do pipelines (water and electricity).Pipeline pressure test.

    3. Waterproof. 4. Laying bricks.

    5. Measure the size (wash basin, toilet, shower room.) Suspended ceilings,)

    6. Installation. 7. Acceptance.

    2. Decoration precautions.

    1. Pipeline: There are upper and lower pipes in the pipe, and there are two kinds of hot and cold water pipes to be considered, as well as the problem of solar energy, washing machines and other electrical appliances on the water. If you have a dry and wet separation in the original bathroom, you should also consider whether to reserve a faucet in the bathroom, you can leave a faucet for washing and mopping, cleaning faucets, don't be too troublesome, once in place, it is very convenient to use in life.

    2. Circuit: The circuit is mainly to consider the reserved wiring port of lighting, water heater, washing machine and other electrical appliances, it is best not to connect the socket in the bathroom, and it is necessary to consider the layout in advance to leave the terminal well, because the bathroom environment is humid and the socket is easy to leak electricity in the humid environment for a long time, resulting in the tragedy of electric shock, even if the socket is occasionally used, the toilet will inevitably have a splash, and there is a chance of leakage in case of splashing, so it is necessary to prevent the tragedy from happening. The lines are all to be chiseled into the wall, so they must be designed before laying wall tiles and floor tiles.

    It is best to install a leakage protector in the bathroom.

    3. Floor tiles and wall tiles: If you don't like the bathroom tiles that come with your house, you must smash them completely, and don't smash part of them after signing, so that not only is it aesthetically incompatible, but the most important thing is that it is not integrated, and the joints will seep water.

    4. Ceiling: Generally, the market is full of aluminum gusset ceilings, and the life of aluminum gusset is longer than that of PVC at home, and the aluminum gusset is of good quality, there are many shapes on the layout, and the price is not very expensive.

    5. The washing machine should not be too close to the bathing place, the washing machine is splashed by water, the swimsuit is rusty and may leak, and the hand dryer is installed next to the sink for easy use.

    6. If the bathroom space allows, it is best to make two small cabinets for storage, and the cashier is very important.

  4. Anonymous users2024-01-21

    New house decoration, which is a pit, such as the layout of the bathroom, if you do not design it, not only life is not convenient, but also everywhere are potential safety hazards, I summarized 5 kinds of bathroom hidden dangers, must be avoided in advance before decoration. The height of a washstand, too high, easy to splash all over the body when washing the face, too low to bend over too tired, with a height of 1.7 meters as an example, the height of the washstand is best arranged at about 85 cm, when standing upright, the hand can touch the bottom of the basin just right, the bottom is best suspended 30 cm, easy to clean. Second, the width of the shower area, when arranging the shower area, the width of both sides should be at least 90 cm, so that the shower will not be tied.

    The height of the top spray is 2 meters, the height of the shower is 1 meter, and the distance between the hot and cold water pipes is 15 cm, so that the tiles will not crack. Three toilets, both sides of the toilet should be reserved more than 70 cm, so as not to look cramped, the toilet paper holder is 60 cm off the ground, pick up the paper to be more convenient, the front of the toilet should be reserved 45 cm, so that sitting, getting up will not be crowded. Four handrails, the installation of handrails, is very useful for the prevention of falls, especially in families with the elderly and children at home, install a handrail in the toilet and shower area, which is very effective.

    Five bathroom mats, many people like to put a towel on the bathroom floor, the purpose is to dry the wet feet, which is actually a big safety hazard. Because towels can only dry feet and are not non-slip, if there are elderly and children at home, it is recommended to use non-slip mats instead of towels. How many of the above five hidden dangers in the bathroom have you hit?

  5. Anonymous users2024-01-20

    1. Hydropower transformation.

    1. Laying of water supply pipes.

    2. The wall circuit is embedded.

    2. Waterproof measures.

    1. The waterproof measures of the bathroom are a necessary project, and the waterproof coating in the bathroom extends from the ground to the wall.

    2. Bathroom waterproofing is mainly: wall and ground waterproofing.

    3. Paving tiles.

    1. Ceramic tile is the decorative material of the floor and wall of the bathroom, which can not only strengthen the waterproof effect of the wall and the ground, but also have a good decorative effect.

    2. Bathroom tiling is mainly: wall tile paving.

    Fourth, ceiling decoration.

    The water vapor in the bathroom tends to rise to the ceiling, so the decorative materials of the ceiling must also have the performance of waterproof, moisture-proof, corrosion-proof and high-temperature resistance. The common bathroom ceiling material is aluminum gusset.

    5. Install a bathtub.

    6. Bathroom basin device.

    7. Bathroom faucets and hardware devices.

Related questions
8 answers2024-08-16

1. Hydropower transformation.

1. Laying of water supply pipes. >>>More

1 answers2024-08-16

1. Hydropower transformation.

1. Laying of water supply pipes. >>>More

2 answers2024-08-16

Hello! You don't even tell me about your house type! Is it a two-bedroom or a three-bedroom! >>>More

2 answers2024-08-16

1. Kitchen and bathroom decoration process.

For the decoration of the kitchen, it is not too complicated, but it must be carried out in accordance with the process, first of all, it is to change the wiring of the wires, and reasonably set up the socket according to the placement of household appliances; The second is the waterproofing of the kitchen, and then the laying of tiles, of course, for the kitchen, the oil smoke is relatively large, and all the walls are best to use tiles for paving. Then there is the ceiling work, and finally the customization of the whole cabinet and the furniture needed for the kitchen. >>>More

8 answers2024-08-16

The process of kitchen renovation:

The basic process of kitchen decoration is: the basic treatment and inspection of the house, the design and construction of the water circuit renovation of the kitchen, the painting and waterproofing, the tile paving, the ceiling installation, the installation of cabinets and stoves, and the installation of kitchen doors. >>>More